New Topics

  • Clarity Schema Conflict Overrides (Clarity 2024)

    Sherry Pittman · 3 · Last reply by Lee Hammarback

    This change is on a per Revit version basis.

    For Clarity 2025, Refer to this blog post:  https://imaginit.helprace.com/i659-clarity-2025-task-tray-configuration-for-error-overrides 

    There is a way to say “Continue Loading” for this kind of Schema Conflict dialog.

    We are currently programmed to always hit “Do not load” for that specific issue, because there’s a risk of data loss.  When we do that it kills the task.

    IMPORTANT NOTE

    Please be aware, this configuration change is at your own risk, and you understand that it will change the model during the task, and you are ok with that.  For most tasks, we don't save the changes

  • Clarity Task Server Configuration to Always Hit OK

    Sherry Pittman · 0 · Posted

    This is done at your own risk and will apply to all models on this task server that have the configuration files modified.

    WARNING Modifying the ClarityTaskTray.exe.config and setting it to “true” will “Always hit the OK button, if there is one”, we feel like this is at least a little bit dangerous, so we don’t have it on by default.  There will still be dialogs this won't work on, since not all dialogs have an OK response.

    Make a copy of the original config file before modifying it so you have a backup. If you edit the config file incorrectly

  • 1

    PDF "garbled" Text Issue

    Taylor DeVaney · 2 · Last reply by Heather

    Some of our PDF files generated from PDF Tasks have text issues to where the text displays as "garbled" text - showing random characters of symbols, letters, and numbers. We use the Arial Font, which all of our Task Servers have installed.

    My workaround is to the issue is to first delete the existing PDF files in the Project's main Artifact folder first so that there is no PDF files that Clarity has to attempt to overwrite, which does seem to help issue, but we have overnight/scheduled PDF Tasks that we run as Check Sets that are  constantly having to

  • 1

    More options for Task Sequence target override

    Brooke Peterson · 1 · Last reply by Matt Mason

    We would like for there to be a way to specify additional options in the task sequence target.

    e.g. Task 1 & 2 use the main task sequence file target - but task 3 uses it's individual set target.

    We run seqence tasks that take a single file, update the file and the duplicate the file based on criteria. I would then like to continue the task sequence - but change the target to the newly created files.

    alternatively an option to sequence a task sequence? Sequence 1 includes sequence 2 and 3 for example? This would also solve the

  • 1

    Can the Project Re-scan frequency please be a configurable setting?

    Brooke Peterson · 1 · Last reply by Matt Mason

    We would like the ability to set how often the projects scan for new files. Ideally this could even be configured on a 'Per project basis'.

    Usually the 30-60 min would not be a concern but we have a few projects with sequenced tasks that generate new files. Those files get picked up and modifed by a new task set to operate immeditely with sync to central (i.e. as soon as it arrives in project). This works, but we have to wait the 30 minutes or manually re-scan the project to do next step.

  • 1

    Clarity cannot access models on BIM360

    Philip Chase · 2 · Last reply by Philip Chase

    We are seeing some major issues where Clarity is telling us it cannot access the models in a project. Tasks will run successfully one day and then fail the next. Or a particular task will run on one model and not another in the same project.

    These are the steps we've found that will fix the problem sometimes:

    1. remove file filters at the project level
    2. remove Clarity from BIM360 project and re-add with Admin permissions
    3. request rescan after adding Clarity as Admin

    IF we have a successful task run after this, we can sometimes add the file filters back into the

  • 1

    Can Tasks be stacked at same time in the Task Timeline?

    Bruce Gunderson · 1 · Last reply by Matt Mason

    How does Clarity manage tasks when they are stacked on top of each other in the Task Timeline?

  • 2

    Issue exporting Clarity Rand database using SQL Server

    James Nolan · 1 · Last reply by Matt Mason

    While exporting the Clarity rand database using SQL server connection, we ran into the following issues and would appreciate your support with resolving.

    1. Clarity index data base is empty
    2. The Modeltime query table is only available for some users, we need that to be available for all the users working on the models. 
    3. There are some query tables that are empty. E.g. (Diagnostic chart, User group, User group project, User group Revit user)
    4. Only some users are visible in user query tables. 
    5. Model Size is negative and unreal number is query tables.
    6. We need to produce a 'matrics over time'
  • Clarity Service Account Password Changed – What to Update

    Sherry Pittman · 0 · Posted

    If you changed the password to the account you use to run your Clarity services, this will stop Clarity from functioning properly until the password is updated in all locations it is used.

    Host

    On the Host this identity is generally used for the following:

    IIS

    • ClarityReportingAppPool
    • ClarityWebAppPool
    • ClarityWebServicesAppPool

    To Update

    • Right Click and select Advanced Settings
    • Select Identity, then the ...
    •       
    • Select Set
    •      
    • Enter the Domain\Username, then password and confirm.
    • Start the Application Pool
    • Repeat for the other two.

    Services

    • Monitoring Service
    • Clarity AD Sync Service

    To update

    • Right click and select Properties
  • 1
    Planned

    Task List Name filter

    Judy Coleman-Graves · 0 · Posted

    Tasks List Filter: I noticed when I type a word in the filter name list (for example PDF) and pick enter. The filter list does not show on the dash board. I need to pick one of the tasks and this is the only task that shows. How can I get the filter list to shown all named tasks with the word PDF when I pick enter?  Could you add this to a future version? I am using Chrome as my browser.

  • 1
    Under Review

    Global Setup Tasks page needs an additional column to filter out deactivated projects

    Andreas Dieckmann · 4 · Last reply by Matt Mason

    In order to be able to ignore tasks from inactive projects on the global Setup Tasks page, could you add add a filter fopr this?

  • 3

    Constrain task to specific task server

    Andreas Dieckmann · 0 · Posted

    As a coordinator or platform admin, it would be great to be able to pick a task server when sending off a task. We regularly need to test new tasks on multiple projects and it doesn't always make sense to constrian the entire project to a specific task server.

  • 1

    Let task servers report their available RAM and disk space

    On the Task Servers page, it would be helpful to have task servers report their available (free) RAM and disk space when they check in.

  • 360 Stale Project Things To Check

    Sherry Pittman · 0 · Posted

    Issue

    Projects are showing as Stale in Clarity

    Cause/Things to Check

    • Autodesk Health
      • Were there Autodesk outages that may have affected things?
        • https://health.autodesk.com/
    • In Clarity

      • Is the Clarity Monitoring Service still running?
        • Stop/Start the service to rescan everything
          • Server tab, Central Host
      • Is the Oauth for that project still valid?
        • Server tab, Settings, Oauth
        • Select Check to see what Hubs/Projects you can see with that Oauth 
          • https://imaginit.helprace.com/i484-clarity-how-to-reset-the-360-oauth-credentials
      • Edit the project and go to the Project Type tab, Edit and re-select the Oauth for the project to reset it.
        • Reset the Sub Folder.
          • It should at least be set to Project
  • Clarity 2023 Task Server Requirements

    Sherry Pittman · 0 · Posted

    We recommend that the task servers be at least comparable to workstations used in production, if not stronger, especially if you are planning on running multiple sessions of Revit and or multiple logins. 

    When referring to the Revit System Requirements I recommend that you go with the performance requirements.  If you choose to use virtualization be aware that graphic intense tasks will not perform as well without a physical graphics card.

    System Requirements

    Please refer to the link below for specific information.

    Revit System Requirements

    Operating Systems:  Windows 10 or 11

    Supported Versions of Revit

    Revit 2019-2023

    Software Licensing

    Any

  • Clarity Windows Task Server Pre-Requisites for Autocad & NW Conversion

    Sherry Pittman · 0 · Posted

    The Navisworks conversion and Autocad tasks are run as a Clarity Windows Task Server task.

    The following must be done on each task server that will be running the tasks.

    Start by logging onto the task server as the designated Clarity account.

    Clarity Task Automation Service Configuration

    In the Clarity task tray, you must set it to use the Clarity Windows Task server.

    On the Configuration tab, Edit the Server

    Expand Windows and make sure that the tasks you want to process are selected.  Ok out of dialogs.

                                                                 

    Services

    Set the logged-on Clarity Windows user account as the Log

  • 1

    How best to edit credentials in Power Bi to the data source so that I can schedule refresh of data automatically

    Bruce Gunderson · 1 · Last reply by Matt Mason

    I am trying to create project dashboards of the revit rooms and areas in power bi. I would like to setup the data set to automatically schedule a refresh of the data as Clarity updates the data once a week. I do not want to go into each projects dashboard in power bi desktop to refresh.

    Power bi is asking to edit the credentials and I am unsure how best to input this information so that Microsoft can view the data and refresh.

    Thanks,

  • Clarity 2023.1 Released

    Matt Mason · 0 · Posted

    Clarity 2023.1 has been released!

    You can see what's new in this webinar:

    https://resources.imaginit.com/building/whats-new-in-clarity-2023-1

    For the documentation showing what's new, check out:

    https://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023.1/index.htm#t=Releases%2FCurrent%20Release.htm

    On December 1, the designated technical contact within your company should have received via email the download link to install the new version of each software.

    If you've got questions, please contact the IMAGINiT Support Center at support (at) rand.com.

    Thanks!

  • 29

    Automate Design Collaboration on BIM360

    Amber Clark · 3 · Last reply by Jason Mounteer

    It would be extremely beneficial if Clarity could create, share, and consume packages through Design Collaboration on BIM360. 

  • 1

    Publish without Design Options

    Craig Uptmor · 2 · Last reply by Craig Uptmor

    I don't see a way to "Accept Design Options" when publishing models. Am I missing this or can we add it in a future release?