Is there a way to export a spreadsheet of all projects, tasks, and task schedules?
It's starting to get a little nuts with all of the projects we're adding. It would be nice to be able to setup a graph of all the projects, which tasks are under each project, and what the schedules are for each task.
The only thing that comes close (that I know of) is task timeline, but it cannot be exported and manipulated. We have to manually create and update a spreadsheet in order to get a visual of what all happens and when.
Is there a feature for this that I'm missing?
-
External Reporting Link causes error/crash of browser
When clicking the "external reporting link" under project home i receive the following error. This greys out the entire screen and forces us to close and re-log in.
An has error occurred in Clarity. Further information may be available in the server log files.
Clarity Support: Phone: +1 (888) 528-4765 (US) Email: support@rand.com
Is there a setting that needs to be changed or updated to allow for external reporting?
-
Cupix
Has there been any discussion around giving Clarity the ability to upload files to Cupix, specifically NWD files?
-
Can I choose between Project Base Point or Shared Coordinate while exporting .ifc file format?
We currently lack the ability to select coordinate systems when exporting IFC using Clarity Task. However, for one of our projects, it's required to export the project with both the base point and the shared coordinates. Is it feasible to incorporate this option into the existing task?
-
What is the max concurrent tasks a central host will support?
We have thousands of tasks defined across several projects on a single central host.
Each of the projects have dedicated Task Machines to them - limited at the project level, but also via project and task type filtering on the task machine.
I observe that when one project has kicked off a large amount of tasks, other project tasks will sit in a new status - even though their respective task machine is sitting there twiddling thumbs.
It feels like that when the task machine is querying for tasks, it is performing something similar to a "select top 1000" ..
-
Does unified synch task support revit server files?
Was wondering if there is a way to use the backup function with revit server files?
-
How many times does a task fail before it disables?
As the question says, after a task fails so many times Clarity disables it and adds a note in the task (which is great). How many fails does it take disable?
-
For BIM360 / ACC projects, can Clarity detect the upgrade and adjust the Clarity Project Settings accordingly?
We've had a few cases where projects were upgraded on ACC and the BIM Manager forgot to go to Clarity and ugrade the project there and tasks just stopped running. Is it possible for Clarity to just do this on it's own?
-
filter a door table
I'd like to filter a door table that I'm adding to a Data sheet. We have nested door panels in our assembled door families. Currently when I make a Door Table, it's showing the individual nested door families as well as the overall assemble family. We have used the "Appears In Schedule" parameter to filter out the panels in our Revit Door schedule, I'd like the ability to do the same in our door tables that we've added to our data sheets.
I've looked at the help menu and I see an option to filter Category Tables, but I don't
-
How to set Clarity to truly run tasks "Only On Change"
I have been having some issues with task queue saturation recently that I haven't previously. From what I have found it appears that projects with models that haven't been synced by non-clarity users for months or even years are churning out tasks for all models, despite being set to "On Change" for all their tasks. This results in Current Tasks filling up too quick for our Clarity task machines to handle. Left on its own, Clarity ends up with a 2000-3000 task backlog after a day or two. Teams expecting PDFs or DWGs are seeing delays and my planned runtimes
-
Can we add columns to the All Projects table view?
Is there a way (or could there be a way) to add columns to the All Projects table view? I saw a couple of other requests about adding task/task server specific columns, but I'm thinking more along the lines of the built in project properties like Type, Hub, Office, maybe Tags and also custom Project Parameters like if we create a BIM Manager parameter (which we have) it would be great to be able to filter the list of projects by that parameter or by office or filter out our hub to see what projects are hosted on external hubs,
-
Hello Support Team, we are looking for support...
Help with migrating from on-prem to cloud, could you support us in this effort? Thank you!
-
Is it safe to upgrade our Task Servers to Autodesk Desktop Connector 16.5?
Seems like a bunch of bug fixes and given how buggy it is, we're just hoping it will help a little to be on the same version as our users. It's been out for nearly 2 months now and I imagine you've had some time to test, but if it's more problematic to upgrade than to stay at 16.4, we will wait.
-
Transfer Clarity Host to new virtual server
Hello,
We are upgrading our physical local server and need to transfer the Clarity Host on current virtual server on the old physical hardware to the new physical server with the transferred or copied virtual server with the Clarity Host. What is the best way to do this? Would setting up a meeting with Imaginit support be helpful?
Any knowledge would be appreciated.
Thanks,
-
Hello has anybody dealt with an issue with Clarity where it is Unable to Copy file a file ?
FileNotFoundException: Could not find file "xxxxxxxxxxxxxxxxxxxxxxxxxxxxx" 1 File(s) attempted to Copy: 0 successful, 1 errors. Post Task Action/Delivery Failure it seems to be making a .zip file but it is unable to copy/move it to a target location
-
What is the file path that I need to enter for the "ProCore Folder" in the "ProCore Sync" task?
We were invited to work with a client's ProCore site and I would like to automate the requested Revit model upload. I am now looking for the folder path that I need to enter for the ProCore sync directory.
-
Missing Tasks under Setup Tasks
Does anyone know why we are missing a chunk of the task lists/options under "Setup Tasks?" Do we need to update Clarity? We just recently updated to 2024 and our build number is 24.0.5.0.
-
Can you create data sheets in different sizes
We're looking to create Room Data sheets in an 11x17 or 22x34 Landscape format. I'm not seeing any information on how to adjust the size.
If I go batch print the Room Data sheet, when I adjust the print setting, it just switches back to the default when you print.