  • 1

    Unified Sync - Bluebeam Studio

    Steven Rushmore · 0 · Posted

    Expanding the unified sync functionality to allow syncing to/from Bluebeam Studio Projects. 

  • 5

    View and batch editor of tags

    Angelica · 1 · Last reply by Steven Rushmore

    Would it be possible to create a view that lists all the projects but with the added column to show what tags are applied? And then the ability to modify/add/delete the tags applied from that screen?

    This would facilitate a quick audit to ensure tags are applied appropriately.

  • 4

    Delete unused Tags

    Angelica · 0 · Posted

    It would be great if we could delete unused tags with a click of a button. My current process is to click a tag and see if any projects come up, then go back to "Manage Tags"  and delete if no projects came up.

  • 1

    Batch/Multi-Project Delete

    Steve Cardinal · 0 · Posted

    Would be great if there were a way to delete multiple projects at the same time. After running Clarity for several years things can get pretty cluttered and being able to delete older projects without having to do so 1 by 1 would be very useful. 

  • 3
    Under Review

    Clarity Task Management UI

    Erik · 0 · Posted

    When working on editing tasks would it be possible to manage the "Time", "Enabled" and "Launchable" toggles at the Setup task Page level instead of having to open and edit each task individually?

    A minor inconvenience that could save a couple of minutes when editing tasks for larger projects.

  • 1

    Autogenerate email when a user is added to project

    Angelica · 2 · Last reply by Matt Mason

    It would be helpful if an email could be autogenerated when a user is added to project. Email would include Project number, project name, if it is a RS project or B360, Revit version, and the role.

  • 1

    Custom Warning on Task Launch

    Brooke Peterson · 0 · Posted

    I think it would be a very nice feature to be able to pop-up a custom warning when the user launches a specific task. e.g. A Custom task that has built in feature to delete the file in destination location and replace it with an updated copy - Would be great to have a popup to use that says, "The Current File will be deleted and replaced with a new copy. Are you sure? " That kind of thing. To allow the user to back-out if they haven't considered everything required for this task etc.

  • 1

    filter options

    Brooke Peterson · 0 · Posted

    Across the life cycle of our projects, the Filename (a.k.a. Target) often changes slightly depending on whether the file remains national or a state based file among other things. It would be really helpful if we had a way to filter files in my completed tasks list by "Contains" instead of "equals"? Or - can i check multiple in the filter list? 

    Also applies to when i want to know what tasks have been run on a particular file name but the path(project) might have been different. e.g. 

  • 1
  • 1

    Option to Create New Project from Untracked Models

    Tim Coppess · 0 · Posted

    Create an option to create a new project from Untracked models as well as ignore untracked models

  • 1

    Select Revit models to detach and download

    Timothy Brummett · 0 · Posted

    Regularly I need to download a copy of specific models and save them to a client's private drive without all of the attachments and folders.

  • 1

    Multiple ClarityPDF Drivers

    Holden Fleck · 3 · Last reply by Matt Mason

    I've been noticing a bottleneck in the scalability of Clarity as a PDF automation tool. You can increase the number of Revit sessions that can run at one time on your task machines, and you can vary the PDF drivers to allow for each session to run PDFs simultaneously. However, varying the drivers only makes sense if you're ok with not having the PDFs coming from Clarity follow the same standard.

    Our use case requires all PDFs to be printed as individual sheets, which requires us to have the naming be consistent and clean. Only the Clarity PDF driver does

  • 1

    Support more than 5 Revit versions back

    Evgeny Kurbatov · 3 · Last reply by Evgeny Kurbatov

    We have a project which still runs in Revit 2018. We have a special agreement with Autodesk to extend our licenses for Revit 2018. We would like to run Clarity task for that project, but it has a limited number of Revit versions to support.

    Can you consider some flexibility for supported Revit versions?

    Thank you.

    Evgeny.

  • 1
    Under Review

    Provide the option to set files to open "Last Viewed" for worksets

    Max Lobo · 1 · Last reply by Matt Mason

    Currently, when Clarity collaborates a model to the cloud, it sets the open option to "Specify" for worksets.  Would be good to have the ability to select "Last Viewed" or other options available in Revit.

  • 1
    Under Review

    Web trigger

    Samuel Ketron · 2 · Last reply by Matt Mason

    We are storing documents on Google Drive. There is a web trigger that you can apply to ACC but if we could have a trigger that applies to google drive, that would be very beneficial.

  • 1

    hard drive size

    Derek Becher · 1 · Last reply by Matt Mason

    I think it would be a good idea to increase the recommended size on your, spec list. Small firms maybe able to get away with 500MB drive, but 1TB is going to be a better long term solution for most firms. We out grew the 500MB drive in less than a year and with rack mounted task server this was a little more complicated that swapping in a new C drive. Its mostly due to the ACC docs folder and the collaboration cache, not the files generated by clarity. 

  • 1
    Under Review

    project sorting default

    Derek Becher · 0 · Posted

    Allow us to change the default sort option on the projects main page to project number or any of the other sorting options. The current default is by name.

  • 1

    copy and rename

    Angelica · 1 · Last reply by Matt Mason

    Could there be a stand alone copy feature with the option to rename files?

  • 3
    Planned

    creator and modifier

    Angelica · 1 · Last reply by Eric Stimmel

    Could you add parameters to show who created a task and who modified it last? 

  • 3

    tag tasks when they are part of a sequence

    Angelica · 0 · Posted

    When there are many tasks and sequences, and a task is being modified it is not obvious that it will affect a sequence or that it is part of one. Perhaps if tags were added to a task when it was added to a sequence.