-
Started
Task Tool: Add ability to disable / enable. Currently just readonly.
Would be great if Clarity's Task Tool had the ability to disable / enable individual tasks. The checkbox value is just readonly now. This would save time for task administrators.
-
Sort Task Timeline to Show Errored Tasks Only
I think it would be helpful to be able to visualize the timeline with only the errored tasks. Like how you can toggle on/off the "Only on Change" property. The ability to toggle the timeline to show only errored tasks would handy.
-
Add PDFCreator for drivers
Hello,
In our company we are using th PDFCreator driver. I found it is better compared to other PDF drivers: 1. It is fast. It takes less time for us to produce drawings. 2. It give true B&W graphics. Just compare its output with the the PDF-XChange result:
I would be happy using it. Hope other user would love it too.
Please add it to the Clarity. Thank you, Evgeny.
-
Backup Host RandRevit database to Cloud
Create a task to backup Host RandRevit database to Cloud for disaster recovery.
This past weekend the office has a security breach and was his by a Ransome virus that wiped out our whole network with all servers and workstations. Not sure if my host server VM was backed up yet.
-
Frequency of Periodic Cleanup
It would be great if we could control the schedule for the periodic cleanup on Task Servers. It would also be good to have a log for the cleanup results.
Thanks!
-
Clarity feature request - task post-actions sequence option
Hello,
Clarity runs post-actions in parallel, which is understood when we want to send files to BIM36, FTP and Google Drive. But there are scenarios when post-action should be performed one after another. For example, after generating files with Clarity I need to do the following:
1. Delete old files in the target network folder. 2. Move the generated file to the target folder. 3. Rename files according client requirements. 4. Send files to shared location.
The post-action should be performed in the given sequence. With the current parallel running the Clarity can delete the newly generated files in the
-
Planned
Create [LocalNetworkPath] keyword
For BIM 360 projects the [ProjectFolder] keyword can not be used in post action file copy because it is a BIM360 path.
Create a new field in the New Project "Local Network Path" used for artifacts.
Then it can be used in Post action tasks in folder paths.
Example path for Local network project - [ProjectFolder]\..\..\CURRENT SET\PDF
Example path for BIM360 project - [LocalNetworkPath]\..\..\CURRENT SET\PDF
-
Show who lasted synced on BIM 360 models on the project page
Right now it appears that the LastModifiedBy column on the BIM360 project home page is not filled out.
Maybe have the clarity client collect this data?
-
upload to Revizto
At to Clarity the option to upload into Revisto.
EllisDon is asking us to discuss using it for our projects.
-
Slight Grammar Issue on the Completed Tasks Tab
I noted that there is a slight grammar issue on the Completed Tasks tab when there is a task timeout. The description says "… just a delay in processing many task [sic] on one …"
-
Under Review
Make Metric Management something that can be done by Coordinators
A Project Coordinator (within a project) should be able to manage the metrics for their models.
Currently it requires a Global Project Coordinator role.
-
Under Review
Expose all data in metric guidance table
It would be very helpful to see all data in the firm metric guidance table, not only when editing the metric's configuration.
-
Under Review
Untracked Models: Ability to ignore models
It would be nice to have an ignore option for the models listed in the Untracked Models section. This list keeps growing longer every day with temporary models that just add noise to the list.
-
Under Review
Metrics: Distinguish between model types
Model size is not always a good modifier for the metrics threshold values.
At our office we usually deal with different model types: main models (contains rooms and all typical building elements, may be split into multiple models depending on size of project), auxiliary models (usually facades, roof structures etc.), site models, detail models (containing most of the detail views hence a lot of detail components, line work and annotation). All of these have typical characteristics which also means they produce very different metrics, e.g. a detail model containing even a single room should set off alarm bells whereas the
-
Under Review
Let task servers learn custom paper sizes from host server
We have some projects that need to use a lot of custom paper sizes. Managing those paper sizes on the host server and multiple task servers is fairly tedious and I was wondering if it wouldn’t be possible to have the task servers “learn” any new paper sizes for the ClarityPDF driver that were created on the host server.
-
relative path
A folder structure is constant (more or less) from project to project. It would be very helpful to specify a path for actions relative to the Revit project folder. It would save time on copying tasks from project to project - no need to adjust the UNC path for every project.
Thank you.
-
I think it would be great for there to be an option to Auto-Sort Tasks Alphabetically.
I find myself clicking the sort button a lot when creating and copying tasks. Would be great if there was an auto-sort function
-
Task Server Page - Sort by Type
Task Server Page - Sort by Type - Be able to only show Revit Task Servers in one group and Windows Task server in another
-
Run task when Link is changed for tasks with "Only on Change" on.
Run task when Link is changed for tasks with "Only on Change" on.
-
Under Review
Cleanup of BIM360 Cache
Would it be possible to make the Cleanup more frequent and/or more aggressive? Hourly cleanup would be ideal if it were able to detect and skip the cache associated with any active Revit Sessions and delete all the others. BIM 360 Cache is chewing up space at an alarming rate.