-
Completed
Model Map - Export options
Hi, the Model Map visualiztion is cool, but we need the ability to export the data to a CSV file or Excel, etc. as this is a lot more useful at times.
-
Completed
Scripting task server pauses
It would be great to be able to script the pause and unpause of task servers so that during maintenance, software installations, windows updates and clarity upgrades we could include the stop and start of tasks to minimize the interference between the tasks and whatever IT work needs to be done.
-
Completed
Make [date] placeholder configurable
It would be great if we could configure the [date] placeholder like e.g. [date:YYmmDD].
-
Completed
Activity Stream: Improve date / time formatting
It's a minor thing, but anyway:
The activity stream doesn't show the time of day in the same format as other lists (e.g. the Completed Tasks list). It gives no indication whether the time of an event is am or pm. Please use the same date/time formatting as used in other lists.
-
Completed
Regular Expressions
It would be great, if clarity could combine regular expressions in view types or sheets.
-
Completed
Dynamo Tasks: Help URL
The help link in Dynamo tasks refers users to dynamobim.org - it would be really useful to be able to provide a custom help link (we document each script in a wiki and I would assume some other firms do that as well). Suggestion: If a dynamo definition contains a Watch node that has been renamed to e.g. "HelpURL" use the URL from that Watch node as a help link.
-
Completed
export task tables to excel
it would be great an an admin to have an export to excel option on the admin table such as tasks to export a specific view of data. for example, filtering errored out tasks run over the weekend on my office task servers, export the report to use as a to-do list to resolve
-
Completed
Display Tags in Project Home
Tags are great. But once you get to the Project Home page of a project, there is no further visibility. You have to Edit the page in order to reveal the tags. It would be great if we can add something like [Tags] to the home page in order to list them out, just like the default [RecentlyUpdatedFiles].
-
Completed
Change Keword [DATE] format from 20190408 to 2019-04-08 in Post Action
Change Keword [DATE] format from 20190408 to 2019-04-08 in Post Action
-
Completed
Dynamo task - Node types - Drop down
Currently, Clarity only support the following type of dynamo nodes (Strings, Numbers, Yes/No, FileNames, Directories, Categories, ElementTypes) as the Help menu show in the link below
http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2019.1/index.htm#t=Admin___Coordinators_Guide%2FTask_Automation%2FScripting_Tasks%2FDynamo_Task_Introduction.htm&rhsearch=dynamo&rhhlterm=dynamo&rhsyns=%20
Many of our dynamo use drop down list were you can select between different options, similar to the category node (which is also a drop down list), would it be possible to add this type of node format in the list of compatible nodes?
-
Completed
Create a Post Action Run a Script - TaskActionPlugins field in Server Settings
To use the post action - Action Type: Script File, the field must contain the full path to the script.
Example - C:\Program Files\IMAGINiT Technologies\Clarity Central Administrator\TaskActionPlugins\17-1556-100 West Park Hospital\Clarity Scripts\Weekly Upload - PDF\ClarityScripter.exe.
Create a field that is in server settings that would contain the location of te TaskActionPlugins
Example -C:\Program Files\IMAGINiT Technologies\Clarity Central Administrator\TaskActionPlugins\
Then in the task we can just put in the rest for the projects location.
Example - 17-1556-100 West Park Hospital\Clarity Scripts\Weekly Upload -
PDF\ClarityScripter.exe.
Right now we are moving this folder to a network location for easier setup instead of logging on the
-
Completed
Sheet Order Parameter
A second "Sheet Order Parameter" in the tasks would be very appreciated. Also the ability to print the sheets in a defined schedule and follow the order of the schedule.
-
Completed
Element’s ID in Navisworks and Revit are different for the same element
Creating a .nwc file exports for Navisworks with "Convert Element ID's" box checked from Revit does not respect the ID in Revit proper. These element’s ID in Navisworks and Revit are different for the same element. This is the same issue when Clarity Task Processor exports to NWC for publish tasks for NWC file or to GLUE.
This setting must be setup on all versions Navisworks Exporter for Revit.
knowledge.autodesk.com