Top Topics

  • 6

    Export to Navisworks using a Default 3D View created by Clarity

    Francisco Gonzalez · 0 · Posted

    Would be good to have the possibility to create a DEFAULT 3D VIEW to export models withour any 3D view dedicated to the NWC Export or coming stripped from consultants.

  • 6
    Under Review

    allow template tasks to be assigned to project during project setup

    Jeremy Luebker · 1 · Last reply by Matt Mason

    the template tasks are great! thank you for adding... would it be possible to allow these to be assigned either as all template tasks or individually?

  • 5

    View and batch editor of tags

    Angelica · 1 · Last reply by Steven Rushmore

    Would it be possible to create a view that lists all the projects but with the added column to show what tags are applied? And then the ability to modify/add/delete the tags applied from that screen?

    This would facilitate a quick audit to ensure tags are applied appropriately.

  • 5

    Remove all XREF-ed images and PDFs from the DWG exports

    Yavor K. · 2 · Last reply by Matt Mason

    Remove all (or embed)  XREF-ed images and PDFs from the DWG exports similar to ‘Remove PCP Output Files’ option.

    In our case we end up with tens of .jpeg and .pdf files because of the nature of some sheets we export from revit.

  • 5

    The "# of CAD Links" model metric isn't reporting the correct value

    Eric Stimmel · 5 · Last reply by Krystyna Kwak

    The metric logged for "# of CAD Links" appears to be reporting imports (not just links) or parts of exploded imports. These are somewhat different problems and calling these all "CAD Links" is a bit misleading - I can assure you this model does not have 2400 linked CAD files. Is there a way to make a distinction between these two things? CAD Links vs Imports or something?

  • 5
    Planned

    Create [LocalNetworkPath] keyword

    Peter DeRooy · 1 · Last reply by Matt Mason

    For BIM 360 projects the [ProjectFolder] keyword can not be used in post action file copy because it is a BIM360 path.

    Create a new field in the New Project  "Local Network Path"  used for artifacts.

    Then it can be used in Post action tasks in folder paths.

    Example path for Local network project  -   [ProjectFolder]\..\..\CURRENT SET\PDF

    Example path for BIM360 project  -  [LocalNetworkPath]\..\..\CURRENT SET\PDF  

  • 5

    Add Task Sever to main column list for current tasks and completed tasks

    Peter DeRooy · 0 · Posted

    Add Task Sever to main column list for current tasks and completed tasks

  • 5

    Add Task Type to Currents Tasks view

    Peter DeRooy · 1 · Last reply by Peter DeRooy

    In both the global Current Tasks and Project Current Task web page the list of fields does not include Task Type. Please add this to both.

    Thanks

    Peter DeRooy

  • 4

    Clarity Task Request: Enscape Batch Rendering

    Trevor Taylor · 0 · Posted

    If you all could hack Enscape's rendering output and provide a way to batch render, I believe you'd gain some new customers and add A LOT of value for your existing Clarity customers.

    Trevor Taylor, ZGF Architects

  • 4

    Scheduled maintenance announcement

    Andreas Dieckmann · 2 · Last reply by Brooke Peterson

    It would  be great to have a mechanism for announcing scheduled maintenance on the host server. While we do inform users via Teams, people regularly miss these announcements. Waht I would like to see in Clarity:

    • Inputs for a message/announcement, a timespan for the maintenance window and a timespan for the announcement
    • The message announcement/message being displayed at the top of *all* pages (including the login screen) during the announcement period (we currently use the Appearance fields in the Settings menu for this).
    • Only admin logins possible during the maintenance period
  • 4

    Transfer Standard - Overwrite

    Evgeny Kurbatov · 0 · Posted

    We have a project which is a building split by multiple partial Revit files. We need to have uniform View Templates through all the models. From time to time we transfer the view templates from one of the models to other models manually using the Overwrite option.

    Using the existing 'Transfer Project Standards' task we get duplicates:

     

    Sorry, it is not the way the task is expected working for us. We just want to overwrite existing view templates as shown on the picture above. Probably other Clarity users would need the 'New Only' option.

    Would it be possible to update

  • 4

    Revit Error Handling Options

    George Suarez · 0 · Posted

    I was hoping for a glossary that would help me trace the dialog boxes back to the Revit error handling option overrides in Clarity. I'm currently experiencing difficulties in determining which option to select, and I find myself needing to individually select each checkbox. Could Clarity consider adding a feature to simplify this process in the future?

    -Chris Luz​​​​ PE, LEED AP Page

  • 4
    Answered

    Is there a way to export a spreadsheet of all projects, tasks, and task schedules?

    Mike Underwood · 7 · Last reply by Daniel Johnson

    It's starting to get a little nuts with all of the projects we're adding.  It would be nice to be able to setup a graph of all the projects, which tasks are under each project, and what the schedules are for each task. 

    The only thing that comes close (that I know of) is task timeline, but it cannot be exported and manipulated.  We have to manually create and update a spreadsheet in order to get a visual of what all happens and when.

    Is there a feature for this that I'm missing?

  • 4

    Exclude Certain Elements when purging using Revit Audit and Compact

    MICAH HARMAN · 2 · Last reply by Jeffrey M Bayer

    Would it be possible to add an option to preserve cetin elements (so they don't get purged) when purging through the Revit audit and compact task. Sometimes there are unused elements that need to be kept and it would be nice to be able to isolate these and keep them from being purged.

  • 4

    Email a group email to all members of project.

    Angelica · 1 · Last reply by Derek Becher

    It would be helpful for those instances that you need to communicate to the team at once. Perhaps the email to group could be on the Manage Users screen.

  • 4

    stp export

    Derek Becher · 1 · Last reply by Matt Mason

    Revit 2025 now has the ability to export .step/.stp files. Can this added to the list of export tasks? We get requests to export parts of our Revit models to step files frequently.

  • 4
    Under Review

    Feature Request: "Run Script" Task

    Paul Patterson · 1 · Last reply by Matt Mason

    We are finding immense value in the basic "Run a Script" post action. However, we achieve so in a round about way by using the FileCopy task to do something meaningless, and then feed a script into the post task action to get the real work done. 

    It would be valuable to have a basic "Run Script" task

  • 4

    Delete unused Tags

    Angelica · 0 · Posted

    It would be great if we could delete unused tags with a click of a button. My current process is to click a tag and see if any projects come up, then go back to "Manage Tags"  and delete if no projects came up.

  • 4

    Provide an action to set all tasks to use "Only On Change".

    Ken Etter · 3 · Last reply by Matt Mason

    Clarity sends emails about inactive projects that still have scheduled tasks running.  It would be great if Clarity had a "quick action" that could set all tasks for a project to run "Only On Change".  Or at least provide an individual action on the Setup Tasks page that would let us toggle "Only On Change" on or off without having to go in and edit each task.  It is currently much too time consuming to edit every single task to make this change.

  • 4
    Under Review

    Can we split the emails between emails from projects/scheduled tasks and emails from user run tasks?

    Jessica Cardinal · 1 · Last reply by Matt Mason

    We are constantly running automated model checks and publications, which fail due to simple things that the admin can take care of, but all users assigned to that project are getting notified. So we turn off their email notifications, which then causes them to not receive emails when they run tasks themselves.