New Topics

  • 4

    Delete unused Tags

    Angelica · 0 · Posted

    It would be great if we could delete unused tags with a click of a button. My current process is to click a tag and see if any projects come up, then go back to "Manage Tags"  and delete if no projects came up.

  • Clarity Requirement for Adding 360/ACC Projects

    Sherry Pittman · 1 · Last reply by Mandi Bishop

    The Clarity App Must Be Active

    If you haven't already added the app, here are instructions on how to Add the Clarity App

    The very first requirement is that the Clarity App be Active in 360/ACC

    360 Project Configuration

    The Oauth identity setup in Clarity must be a project member of all projects you want to add to Clarity. That identity must also be a part of the document management team with appropriate permissions to the folders you need to access to be able to perform the tasks you want to run on the project.

    You likely have multiple 360

  • 1

    How many times does a task fail before it disables?

    Angelica · 2 · Last reply by Andreas Dieckmann

    As the question says,  after a task fails so many times Clarity disables it and adds a note in the task (which is great). How many fails does it take disable? 

  • Switching Clarity Task Servers to Autodesk SSO

    Sherry Pittman · 0 · Posted

    General Information

    Clarity Web Portal

    If you turn on Autodesk SSO – you don’t have to change how you sign into the Clarity web app. They are independent.

    Task Servers

    Clarity will work fine with Autodesk SSO, but there are some things to be aware of that will need to change on and for the task servers.

    The accounts that will be used for the task servers, although not physical users, still must conform to the same rules for Autodesk SSO.

    On the Autodesk Side

    The account must be a real domain account which is able to receive emails and

  • Clarity Journaling Service Won’t Stay Running

    Sherry Pittman · 0 · Posted

    Prerequisite

    .NET 6.0 Runtime installed

    Download Link

    Make sure the service is set to Log On as the Clarity Service account.

    Issue:

    The Journaling service won’t stay running even though the dotnet 6 is installed.

    Solution:

    We need to make a configuration change to the appsettings.json file in this folder on the host:  C:\Program Files\IMAGINiT Technologies\Clarity Journal Service

    Process

    Make a backup of the appsettings.json file and change the extension to .orig

    Modify the .json file in Notepad.

    Add the line below, (highlighted in green in the screen shot) after the password but before the “

    ;TrustServerCertificate=True

    If you get

  • 1

    Batch/Multi-Project Delete

    Steve Cardinal · 0 · Posted

    Would be great if there were a way to delete multiple projects at the same time. After running Clarity for several years things can get pretty cluttered and being able to delete older projects without having to do so 1 by 1 would be very useful. 

  • 3
    Under Review

    Clarity Task Management UI

    Erik · 0 · Posted

    When working on editing tasks would it be possible to manage the "Time", "Enabled" and "Launchable" toggles at the Setup task Page level instead of having to open and edit each task individually?

    A minor inconvenience that could save a couple of minutes when editing tasks for larger projects.

  • 1

    Autogenerate email when a user is added to project

    Angelica · 2 · Last reply by Matt Mason

    It would be helpful if an email could be autogenerated when a user is added to project. Email would include Project number, project name, if it is a RS project or B360, Revit version, and the role.

  • 1

    Room Image Exported from Plan Missing Some information

    Dave Peterson · 1 · Last reply by Dave Peterson

    I set up a room image Task.  Task points at the correct view.  Task Runs.  Images are exported.  New Images are created.  The newly added objects appear but the Tags are missing.  Objects are also listed in the object schedule below.

  • 1

    For BIM360 / ACC projects, can Clarity detect the upgrade and adjust the Clarity Project Settings accordingly?

    Eric Stimmel · 2 · Last reply by Matt Mason

    We've had a few cases where projects were upgraded on ACC and the BIM Manager forgot to go to Clarity and ugrade the project there and tasks just stopped running. Is it possible for Clarity to just do this on it's own?

  • Clarity and FIPS

    Sherry Pittman · 0 · Posted

    You want to know if you can enable FIPs on Clarity machines.

    What is FIPS? FIPS stands for Federal Information Processing Standards These are standards and guidelines for federal computer systems that are developed by National Institute of Standards and Technology (NIST) in accordance with the Federal Information Security Management Act (FISMA) and approved by the Secretary of Commerce.

    If you are working on government projects, this is something that will likely apply to you.

    You can find out more about FIPS at the link below. https://www.nist.gov/standardsgov/compliance-faqs-federal-information-processing-standards-fips#2

    Clarity General Information Clarity should sense that FIPS is enabled. This information will

  • Clearing Space on the Task Server

    Sherry Pittman · 0 · Posted

    There are cleanup options in the Clarity task tray, which if checked will try to run once a day about 24 hours after the task tray was started last. Note: We cannot do the cleanup if Revit is running, so if tasks are always running, the cleanup may not occur. There could also be permission issues with deleting things as well at times.

    So, if you want to clean up things manually, I have listed the locations below where you can regain some drive space.

    You may also want to consider using the Windows Task Scheduler to clean things up.

  • 1

    Custom Warning on Task Launch

    Brooke Peterson · 0 · Posted

    I think it would be a very nice feature to be able to pop-up a custom warning when the user launches a specific task. e.g. A Custom task that has built in feature to delete the file in destination location and replace it with an updated copy - Would be great to have a popup to use that says, "The Current File will be deleted and replaced with a new copy. Are you sure? " That kind of thing. To allow the user to back-out if they haven't considered everything required for this task etc.

  • 1

    filter options

    Brooke Peterson · 0 · Posted

    Across the life cycle of our projects, the Filename (a.k.a. Target) often changes slightly depending on whether the file remains national or a state based file among other things. It would be really helpful if we had a way to filter files in my completed tasks list by "Contains" instead of "equals"? Or - can i check multiple in the filter list? 

    Also applies to when i want to know what tasks have been run on a particular file name but the path(project) might have been different. e.g. 

  • How to Edit a 360 Project in Clarity

    Sherry Pittman · 0 · Posted

    If you need to change the path, the version or any other setting specified in the project settings you will need to edit the project.

    How to Edit the Project

    From the Project Home page, select the pencil and checkbox in the upper right corner, Edit Project.

    Select the Project Type tab

    To Change the Version of Revit in the Project

    If you need to change the version of Revit used for the project select update version. 

    This will not upgrade models, it simply sets the version of Revit used to perform tasks.

    On the Project Type tab, select Update

  • How To Clear the Task Server Logs Folder

    Sherry Pittman · 0 · Posted

    Issue

    If you are unable to send diagnostics from the Clarity web portal completed task id, sometimes clearing the content of the logs folder will resolve the issue.

    Process

    • Log onto the task server as the designated Clarity account
    • Exit the Clarity task tray, by right clicking on the Clarity icon and select Exit
    • Open Services and Stop the Clarity Windows Task Server Service
    • From File Explorer browse to the logs folder for your version of Clarity
    • Example: C:\ProgramData\IMAGINiT Technologies\Clarity Task Server 2024\Logs
      • You can zip the logs folder if you want an archive copy or need to send them
  • 1
  • 1

    filter a door table

    Dave Peterson · 2 · Last reply by Matt Mason

    I'd like to filter a door table that I'm adding to a Data sheet.  We have nested door panels in our assembled door families.  Currently when I make a Door Table, it's showing the individual nested door families as well as the overall assemble family.  We have used the "Appears In Schedule" parameter to filter out the panels in our Revit Door schedule, I'd like the ability to do the same in our door tables that we've added to our data sheets.  

    I've looked at the help menu and I see an option to filter Category Tables, but I don't

  • 1
  • 1

    Option to Create New Project from Untracked Models

    Tim Coppess · 0 · Posted

    Create an option to create a new project from Untracked models as well as ignore untracked models