New Topics

  • 6

    Select-DeSelect All Days in Task Schedule

    Mike Underwood · 0 · Posted

    It would be swell if there was a Select All and a De-Select All option for task schedule days. When you change from On Demand to Scheduled, all of the day checkboxes are activated. One example use-case:  If I need to create a bunch of tasks that run one day per week, I spend a bit of time un-checking check boxes.  Be nice to click a "Uncheck All" and then check the one day I need.

    See attached image.

  • Clarity Task Server Office Location Configuration

    Sherry Pittman · 0 · Posted

    If you want to set up Office Locations to specify for Task Servers, there are a few places that needs to be set.

    In the Clarity Web Portal

    • Log into the Clarity web portal as an Admin
    • On the Server tab, Offices, add the office locations.
    • Once you assign an office to a project, it will increase the number of projects.
    • Once you assign an Office Location to a task server, it will increase the number of Task Servers.

    On the Task Servers

    • Log onto the task server as the designated Clarity account
    • Open the Clarity Task Tray
    • On the
  • 1

    PDF Page Setup - Offset from corner not center

    Dustin Gore · 0 · Posted

    Minor typo... The Page Setup for In Session in Clarity says "Offset from Center."  I believe this should be "Offset from corner as it is in Revit.  Center is a different radio button.

  • 7

    Add Revit Version Column to Task Tables

    Maya Mashiach · 1 · Last reply by Matt Mason

    It would be useful to be able to see and filter our tasks (completed and current) by the Revit Version of the project being run. 

    This would allow us to gauge how many projects are running through each version of Revit in task load across projects. 

  • 1

    Cloud model size - host only

    Evgeny Kurbatov · 0 · Posted

    Currently the project home page show the model file size as summary size of the host model together with links.

    I think it would be more informative to see the host model size only. Or show both: host and full size?

  • 3

    Purge selected categories

    Evgeny Kurbatov · 0 · Posted

    I need to purge periodically Revit design models, but I don't want to remove all unused elements. I need to keep many elements like tags, pipe types, duct types, etc. in the mechanical model, because they are defined in the model by the company standard. But I want to delete all Families which people load for Mechanical Equipment, Pipe Accessories, Duct accessories, etc. They contribute the most to the models file size.

    It would be nice if and application "Purge Categories" can be created. There I could select the categories I want to purge from the project. In fact, this

  • 4

    Revit Error Handling Options

    George Suarez · 0 · Posted

    I was hoping for a glossary that would help me trace the dialog boxes back to the Revit error handling option overrides in Clarity. I'm currently experiencing difficulties in determining which option to select, and I find myself needing to individually select each checkbox. Could Clarity consider adding a feature to simplify this process in the future?

    -Chris Luz​​​​ PE, LEED AP Page

  • 1

    add Interference Check task

    Chris Rawlings · 3 · Last reply by Chris Rawlings

    I would like to automate the Interference Check task and have it export the report

  • How to Remove a Retired Task Server

    Sherry Pittman · 0 · Posted

    Issue

    You replaced a task server, but you can still see the old one on the Task Servers list

    Cause

    The task servers will drop off the last after Clarity hasn’t seen them for 21 days, unless there are still projects assigned to it.

    You can force the removal as long as there are not projects assigned to the task server.

    Solution

    In the Clarity web portal, Task tab, Task Servers, select the task server to see if there are any projects assigned to it. 

    If there are Projects assigned, you will need to go to each of the projects

  • Ionic Zip Update Error

    Sherry Pittman · 0 · Posted

    If you are trying to update the software and are running into the following error message

    Could not load file or assembly Ionic.zip, you will need to copy the file from another location to resolve the issue.

    Resolution

    Log onto the host as the Application Pool identity

    Through File Explorer, browse to: C:\Program Files\IMAGINiT Technologies\Clarity Monitoring Service

    Copy the "Ionic.Zip.dll" file to a network location that you can access from the task server. Copy that dll into the following folder on your task server: 

    C:\Program Files\IMAGINiT Technologies\Clarity Task Server for Revit Make sure it isn't blocked by right clicking and

  • 14

    Publish Settings List Report

    Timothy Brummett · 0 · Posted

    I'd love to be able to export a list of models with their named sets of Publish Settings. I could then see if there are any missing or misspelled sets the Print Range Clarity is looking for when exporting dwg's or pdf's.

  • 1

    Unified Sync task from ProjectWise to BIM360 is copying outdated versions of files

    Eduardo Mancilla · 0 · Posted

    I have a task running to sync all the folders and files from ProjectWise to BIM360, and I noticed that files where the file name was modified are being copied over as the previous version. By that I mean the following: Original_File1.dwg               Version " "

    *name change*

    Newname_File1.dwg           Version  "A"

    *update*

    Newname_File1.dwg           Version  "B"

    Then the sync task runs, it creates 2 files, the Version " " with the old name, and the Version "B" with the updated data. It shouldn't copy the first original file

  • 8

    automatically update project Revit version

    Ken Etter · 2 · Last reply by Eric Stimmel

    It would be great if Clarity could see that a project has been upgraded to a newer Revit version and adjust itself accordingly.  We have had reports of users upgrading models and not informing our BIM Manager so Clarity fails because it is trying to run tasks with an older version of Revit.

  • Clarity 2025.1 Released

    Mandi Bishop · 0 · Posted

    The Clarity team is happy to announce the availability of Clarity 2025.1!

    This new version includes:

    • Bluebeam Integration
    • Multi-Project Actions
    • Task Management Enhancements

    And more. You are welcome to join us at the link below for a short webinar related to what's in the Clarity 2025.1 product.

    Date: Wednesday November 27, 1pm EST.

    Register Here

    How Will I Get My Copy?

    An email will be sent in the next day or so to the designated contact for your company with the new download.

    If you do not receive it within a couple of days, please:

    1. Check the spam filter

  • 1

    More control of failed tasks

    Hilary Williams · 0 · Posted

    Tasks that failed, I would like to Batch control what happens based on what they are. I would like to Batch re-start all of the Publish tasks. all of the Daily metrics, just batch delete and let them cycle back around for instance.

  • 1

    Quick Button to plot a Linked Model, But not open

    Hilary Williams · 1 · Last reply by Matt Mason

    For Background, I know that when I open a model we can plot a linked model from the pyRevit plot command. But is there a way to automate this function through Clarity? We have the need to refer to another discipline sheets on the hub, and not everyone publishes their sheets like they should.

    We need a way to be able to quickly plot links to pdf while NOT opening the other firms model.

    On the ACC, I often only have View + Download permissions to other firms models. So, we can't open those links anyways.

  • 1

    Add Ability to turn off Log Preview in the Task Queue Screen

    Brooke Peterson · 0 · Posted

    While the short preview of running logs is sometimes very useful in the task screen:

    There are times when assessing a long queue that it would be very nice to have option to turn off the log previews to condense the list and make it easier to find the info i'm looking for. Would it be possible to toggle on/off the log preview?

  • 1

    Periodic Snapshot of Tasks Dashboard

    Holden Fleck · 0 · Posted

    For the purpose of high level task health monitoring it would be helpful to be able to set up an Alert or something similar that would send an email containing the task metrics for the last hour, day, etc... similar to the Dashboard page from the Tasks tab.

    If I could have Clarity email just me or certain admins a dashboard that shows task health for the last hour, it could help catch systemic issues with the server or task machines earlier, especially if Clarity maintenance is not in my scope of work in a given day or week.

  • How to Increase the Size of the AdminWebservice Logs on the Host

    Sherry Pittman · 0 · Posted

    The AdminWebservice logs, with the default settings will roll over at 100kb. If you have a large amount of data you have may roll over too quickly for us to find the information we need for diagnostics.

    On the host machine go to the folder below and edit the Log4net.config as follows:

    C:\inetpub\wwwroot\CentralWebservices

    Change the value as shown below to increase the file size to 1mb.

    <maximumFileSize value="1000000" />

    You can also increase the quantity if you like.  

     You may get an error when trying to save the file, so Save As and make sure that the Save as Type

  • Clarity Task Tray Proxy Config for Sending Task Diagnostics from Completed Task ID

    Sherry Pittman · 0 · Posted

    Issue:

    Error sending task diagnostics from the host when things are locked down due to security reasons.

    If sending diagnostics normally works, then clearing the logs folder will likely resolve the issue and this configuration change is not needed.

    Please refer to the following blog to clear the logs folder:  https://imaginit.helprace.com/i602-how-to-clear-the-task-server-logs-folder

     Process:

    1. Log onto the task server as the designated Clarity account
    2. Exit the Clarity task tray and stop the Clarity Windows task server service in Services
    3. Zip the content of the logs folder (replace the highlighted value with your version of Clarity if different): C:\ProgramData\IMAGINiT Technologies\Clarity Task Server 2024\Logs
    4. Delete