Top Topics

  • 3

    Change all scheduled projects tasks Only On Change with one click

    Peter DeRooy · 0 · Posted

    create a button to Change all scheduled projects tasks Only On Change with one click.

    Maybe setup a option on the host server to show projects without any changes 90 days to quickly change all tasks to  Only On Change

  • 3

    change Default for Scheduled task to weekly

    Peter DeRooy · 1 · Last reply by Matt Mason

    Change Default for Scheduled task to weekly. Right now it defaults to Every 3 Weeks.

  • 3

    Clarity.TaskUtility.exe feature requests

    Peter DeRooy · 0 · Posted

    Clarity.TaskUtility.exe feature requests

    1. Make changes to task options and save.
    2. Filter by Task Type
    3. Export to Excel current list of tasks
  • 3

    Send to ME - Like Send to Imaginit

    Peter DeRooy · 1 · Last reply by Matt Mason

    create a "Send to Me" button under the "Send to Imainit" button on the task log page.

    Email the same info to me so I can loog at the journal file without having to go to the Task Processor to find it.

  • 3

    Firm Metric Guidance: Ability to distinguish metrics by type

    Andreas Dieckmann · 0 · Posted

    It would be helpful to have an additional column "Metric type" that indicates the source of the respective metric (values: "Basic Revit Info", "Performance Advisor", "Quantity Snapshot", "Model Metrics", "Custom"). It would be even nicer if the dropdown were also ordered first by metric type.

  • 3

    Add "ungroup all groups" in the PublishRevitModel task

    Peter DeRooy · 1 · Last reply by Peter DeRooy

    We have a need to export a model with all groups Ungrouped.

    Please add "ungroup all groups" in the PublishRevitModel task

  • 3
    Under Review

    Format Central Admin Lists

    Mike Underwood · 0 · Posted

    It would be nice if lists such as the task tables and user lists could be formatted to allow more than 20 rows at a time.  It is time-consuming to have to page through the multitude of records to get to the right row, even with sorting and filtering. 

  • 3

    Add Google Drive support

    Peter DeRooy · 2 · Last reply by Peter DeRooy

    Add Google Drive support for the post action copy / move option

  • 3
    Under Review

    Missing Link - add the option to ignore missing sub-links in links

    Peter DeRooy · 2 · Last reply by KB

    When clarity is running a PDF task with option for error on missing links on it fails if a link itself is missing an attached link. Please add the option to ignore missing sub-links in links 

  • 3

    Create a BIM360 Upload task to a BIM360 project

    Peter DeRooy · 1 · Last reply by Matt Mason

    Create a BIM360 upload task that does not require Revit. this would be great to able for a local workshare project to upload weekly PDF and model exchages to a BIM 360 Docs folder.

    The PDF upload option should be able to have wildcards like *.PDF for uploading singe page PDF's in batch mode.

  • 3

    Update Revit File From Disk - Target Path

    Marcos Alonso · 0 · Posted

    How can one specify a path location that is one or two folder before the project/ target path? 

    This path would be the path to where the updated revit file, that has been stripped, will be saved too.

    in short, the idea is to be able to update a revit file that is with in the main project folder but is not within the working directory, which seems to be the target directory as well, as a subfolder.

    Thanks in advance

  • 3

    Clarity should include Bim Track Integration to upload PDF and IFC files.

    Peter DeRooy · 0 · Posted

    Hello Matt

    I think Clarity should look at Bim Track Integration to upload PDF and IFC files.

    https://bimtrack.co//resources/integrations#addinslist

     Regards,

     Peter DeRooy

  • 3

    Remember column selection

    Andreas Dieckmann · 1 · Last reply by Matt Mason

    The column selection on pages like Completed Tasks only seems to be a per-session setting. It would be nice if Clarity could remember these settings persistently per user across sessions.

  • 3

    Imporve PDF upload to Bim 360 Docs to support sets

    Peter DeRooy · 0 · Posted

    for the post action task add the option to post a Mulit-Page PDF that BIM 360 Docs extracts the pages with a title block template that files in the meta data for each sheet.

    See Attached Word doc

  • 3

    Add features to family upgrade task

    William J Carney · 0 · Posted

    I'd love to see an option added to the family upgrade task to clean the backup files that are created. Also, it would be awesome to have the task when scheduled take advantage of the option of on changes only. This would allow us to have the task run nightly at a low priority and keep the library in the correct version. 

  • 2

    Get example output when entering formula / coding for filename builders.

    Mark Sheen · 0 · Posted

    When using formulas and codes to concatenate an output filename the inclusion of 'show example output' to test those concatenations would be handy, especially when trying to use 'regex' or 'sql' variables

  • 2

    Ability to export to DXF as a task

    Heather · 1 · Last reply by Matt Mason

    The ability to export to DXF just like DWG. 

  • 2

    Transpose model metrics

    Andreas Dieckmann · 1 · Last reply by Mandi Bishop

    It would be great to be able to switch to an alternative model metrics view that shows the data transposed (models as columns, metrics as rows).

    The number of metrics by far exceeds the number of models and a lot of folks prefer scrolling vertically (or maybe it's just me).

    So I modified the Model Metrics page but it will probably be overwritten with each host server update... I'd be happy to share my modified version of the Model Metrics page.

  • 2

    Files might be locked by Navisworks

    Mike Underwood · 1 · Last reply by Mike Underwood

    They're not.

    Navisworks Conversion tasks have been failing and generating the following error: 

    44 found and filtered to 43 documents to process.  Sending 43 files to be processed.  Starting Navisworks for 43 combined files  Navisworks logging to C:\ProgramData\IMAGINiT Technologies\Clarity Task Server 2025\Logs\Navisworks\[Task ID]\NavisworksTask_[Task ID]\[destination-file].txt  Success running Navisworks conversion [destination-file].nwd  Processing output file 1/1 - [file output path]  Error: 1/1 files were not modified: [file output path]. None of the files were successfully processed. Check your Navisworks installation for issues.  Files might be locked by Navisworks. Enabling 'Close NWC\NWD files on load' in Navisworks to disable locking. 

    This error indicates that the destination file

  • 2

    Show which task sequences a task is used in

    Andreas Dieckmann · 0 · Posted

    When in task edit mode, it would be great if the edit page included links to any task sequences the current task is assigned to. (In task sequences we can navigate to the tasks included in the sequences - why not the other way round as well?)