-
Answered
Transfer Project Standards, from to Egnyte
Hi
Set up a task to update some families into existing project drawing. Task completes but updated file is left behind in task server temp directory
I tried to configure a post action to copy and overwrite existing file - no success
I tried to configure post action to Egnyte Upload - no success
Any suggestions on how I can update original file after transferring project standards?
Max
-
Answered
How do I get BIM360 Migrate to show under synchronization
I am trying to set up a task to pull models from one hub to another but I do not have the BIM 360 Migrate under synchronization. How do I get this option to show up?
-
Answered
Copying Revit Files from one BIM 360 folder to another in the same project.
Once a week my team goes into BIM 360 and does this to copy the published models out for other teams to download/use. We literally go into BIM 360 and use this command on 4-5 models each week.
I'm trying to figure out how I can automate this for the team. The Copy File command doesn't seem to have a straightforward way of copying from 1 BIM 360 folder to another.
-
How best to edit credentials in Power Bi to the data source so that I can schedule refresh of data automatically
I am trying to create project dashboards of the revit rooms and areas in power bi. I would like to setup the data set to automatically schedule a refresh of the data as Clarity updates the data once a week. I do not want to go into each projects dashboard in power bi desktop to refresh.
Power bi is asking to edit the credentials and I am unsure how best to input this information so that Microsoft can view the data and refresh.
Thanks,
-
Answered
Can you use Project Parameters in post task action tasks?
As the subject states. The support documentation says this:
Does this mean I could create an "Office" Parameter and use that parameter in the post task actions? See previous post on this here:
Add office to the available Keywords | IMAGINiT Support (helprace.com) So, a possible post task action path could be : "\\MyServerName\[Office]\[Project]\Clarity Stuff"
It appears that way after read this:
However I don't see anything related to how to specifically call a Project Parameter in a task or post task action.
-
Answered
Automate exports of Revit Schedules to a file path on local server? Thanks!
Hello there! Passionate user of Clarity. Thank you for all the hard work! I've created a PowerBi Dashboard that works with Revit Schedule .txt files. I see there is a functionality to automate schedule exports, but the schedules save on the Clarity site. Is there an option to specify a file path on your local server? Thanks!
-
Answered
Duplicate Projects on BIM360/ACC list.
During project startup we've started seeing this a lot.
Multiple identical projects on the BIM360/ACC project list. This is really confusing as one of these projects is the correct project. If we pick the wrong project during startup all the tasks fail out as clarity "Cannot find a revit model..."
Currently or fix is this: 1) Identify if a project is set correctly (revit file names, file filters, etc) 2) If the project is set correctly- Delete the clarity project and make a new project pointed at a different project on the list (maybe this is the correct one, this
-
Can Tasks be stacked at same time in the Task Timeline?
How does Clarity manage tasks when they are stacked on top of each other in the Task Timeline?
-
Help me understand the differences between these two tasks
I'm comparing the Backup Project and the BIM360/ACC Download tasks. They both seem to do the same thing but with slightly different means.
The Backup Project task is more of a true backup for BIM360/ACC (appears to pull additional information like Issues, checklists, RFIs, linked files etc). This information (which could be quite a lot) is then zipped and put in a designated location (on the host or a server location). This appears to work with live Revit models (and apparently it will bundle in linked files if it can find them).
The BIM360/ACC Download task seems to be more
-
Answered
Breaking Large Print Jobs Up
If I wanted to take a large print job (several hundred pages) and break it up into multiple smaller jobs that could be distributed across multiple task servers, how would I do that?
This is what I have built so far:
1) In Revit break the print set into multiple sets "Print Set Name X of Y". This could be done relatively quickly with one of many tools (dynamo, ideate, etc.).
2) Create identical PDF tasks for each "X of Y" print set. Post task action place the PDFs in a common location.
3) Schedule the tasks to run at
-
Can Clarity generate a report of schedules in multiple models?
We have a project with several models and I would like to generate a report of all of the schedules that exist in each model. I don't need all of the 'internalxx' variations of things like revision schedules and keynote legends. Is there a way to do this?
-
Answered
Column Grid Reports
I do not see Grids as a category (source table) option when creating a new project report. I want to get a report of the worksets all my grids are on, if they are pinned and if they are monitoring grids in a linked model. Also, I do not see a Grids table in the RandRevit SQL database. Should there be?
I'm running tasks Database Export, Model Metrics and Performance Advisor. I would assume that is enough to get column grid data into the database.
Currently we have Clarity version 22.1.18.0
Thanks!
-
How best to clean or gain memory on the host server?
Our host server is using a lot of memory. What are some best practices to manage the memory on the host server?
Thanks,
Bruce
-
Answered
We need access the svg files from the DB Export Task. Where are these saved?
We need access to the svg files from the DB Export task. Where are these saved?
Thanks,
Bruce
-
Answered
Floors in Project Query
I'm trying to set up a project query for floors. I cannot find the floor category from the dropdown.
There is an entry for Roofs but not Floors. I found MassFloors, but I don't think that's the object I'm looking for.
-
Answered
ProjectName & ProjectNumber in the Project Message
Patch Notes for 23.1.6 say we can use ProjectName & ProjectNumber in the Building Message, What is the syntax for that?
-
eTransmitting a model from acc
I've been puzzling this out for a couple days and I'm stumped. If I wanted to make the process of downloading a prepping a model for eTransmit from BIM 360/ACC, how would I do that?
The process I'm trying to replicate:
1) Publish the target model and all linked models 2) Download the target model and all linked models to a local location 3) unzip the downloaded file from BIM 360/ACC 4) Open the target model and save as central file 5) Confirm all links are now relative 6) SWC / Close 7) eTransmit target model (and run cleanup tasks)
-
My system was recently updated and now all my existing projects are set to Revit 2023 can I change them to the correct release?
Recently had my Clarity brought back after losing the service, but when I try to access my projects, they have all been set to Revit 2023. Can this be fixed?
-
Can you create data sheets in different sizes
We're looking to create Room Data sheets in an 11x17 or 22x34 Landscape format. I'm not seeing any information on how to adjust the size.
If I go batch print the Room Data sheet, when I adjust the print setting, it just switches back to the default when you print.