  • 1

    How to avoid "Calculating..."?

    Evgeny Kurbatov · 0 · Posted

    Hello,

    The Clarity printed sheets with the "Calculating..." message.

    It there a way to make the Clarity waiting for finishing of the calculations and then print?

    Thank you, Evgeny.

  • 1

    Add PDFCreator for drivers

    Evgeny Kurbatov · 3 · Last reply by Matt Mason

    Hello,

    In our company we are using th PDFCreator driver. I found it is better compared to other PDF drivers: 1. It is fast. It takes less time for us to produce drawings. 2. It give true B&W graphics. Just compare its output with the the PDF-XChange result:

    I would be happy using it. Hope other user would love it too. 

    Please add it to the Clarity. Thank you, Evgeny.

  • 1

    View link in All Projects list sometimes goes wrong

    R Robert Bell · 0 · Posted

    I've discovered that when I use the View link from the All Projects list view, sometimes the link doesn't work correctly. Most project's View link does go to the project, but at least one is just going back to the all projects view. I recorded a video of the issue that I only can share with tech support.

  • 1

    [ProjectFolder] for Run Sript post-action

    Evgeny Kurbatov · 0 · Posted

    Hi there,

    The Post Task Actions Overview help article tells about available keywords.

    I try to apply the [ProjectFolder] keyword for my Run Script post-action. Finished task reports an error:

    The specified Post Action Script: [ProjectFolder]\Current Clarity Set\PDF\Pre-FullSet-Black.bat does not exist?

    How can we make the [ProjectFolder] keyword working?

    Thank you.

    EK

  • 1

    Backup Host RandRevit database to Cloud

    Peter DeRooy · 0 · Posted

    Create a task to backup Host RandRevit database to Cloud for disaster recovery.

    This past weekend the office has a security breach and was his by  a Ransome virus that wiped out our whole network with all servers and workstations.  Not sure if my host server VM was backed up yet.

  • 1

    Disconnected from central

    Evgeny Kurbatov · 0 · Posted

    Hello,

    The eTransfer command generates an interesting version of the target Revit file - it is disconnected from any central file. I would like the "Publish Revit Model" task would be able to create such file. 

    Why. I run the task and it creates a target tile in a network folder. Then I upload the file to BIM36o. And here is a problem - I cannot link the file properly. I believe it happens because the BIM360 file is a copy of the task created networked (central) file and it is considered as a local file. When we link a

  • 1

    custom revit model file name

    Evgeny Kurbatov · 4 · Last reply by Craig Uptmor

    Hi,

    I use the Publish Revit Model task and want to customize the output filename by client's requirements. I can't find a Filename Builder or just an ability to type its name directly. Do I miss something?

    Thank you,

    Evgeny.

  • 1

    Clarity feature request - task post-actions sequence option

    Evgeny Kurbatov · 0 · Posted

    Hello,

    Clarity runs post-actions in parallel, which is understood when we want to send files to BIM36, FTP and Google Drive. But there are scenarios when post-action should be performed one after another. For example, after generating files with Clarity I need to do the following:

    1. Delete old files in the target network folder. 2. Move the generated file to the target folder. 3. Rename files according client requirements. 4. Send files to shared location.

    The post-action should be performed in the given sequence. With the current parallel running the Clarity can delete the newly generated files in the

  • 1

    Show who lasted synced on BIM 360 models on the project page

    Peter DeRooy · 0 · Posted

    Right now it appears that the LastModifiedBy column on the BIM360 project home page is not filled out.

    Maybe have the clarity client collect this data?

  • 1

    Should Clarity be able to see the deleted files in BIM 360 Docs?

    Anthony Harwood · 1 · Last reply by Matt Mason

    Hi!

    I have deleted a model in BIM 360 Docs but Clarity still runs tasks on it. Has anyone else run into this? I tried to purge the model from the deleted area in BIM 360 and cannot see how to. Besides setting up a file filter for the project, is there anything else I can do? I can foresee this becoming a difficult to manage having to monitor deleted files and filtering them out of our tasks.

    Thanks in advance!

    TonyH

  • Use of Worksets within Clarity (incl BIM360)

    Matt Mason · 0 · Posted

    Since Clarity 2020, it's been possible to specify worksets on a given task. If you've run the RevitDBExport task, then you could see the worksets to choose from on the "Basic" tab.

    Starting in Clarity 2021, it is also possible to specify worksets with BIM360 projects (in this case you must have run the RevitDBExport task at least once).

    You can use these workset settings to:

    • Improve performance by not opening all worksets
    • Control visibility

    On the "Advanced" tab, it's also possible to specify wildcards - as well as negative wildcards (such as "don't show anything that includes the word

  • 1

    How do you remove old task servers?

    R Robert Bell · 1 · Last reply by Matt Mason

    Our list of task servers in the server console show old task servers, either ones that have been renamed or others that have been decommissioned. I see no way to manage those nor does the documentation describe how the Task Server page is updated. Am I missing information somewhere?

  • 1

    Slight Grammar Issue on the Completed Tasks Tab

    R Robert Bell · 2 · Last reply by R Robert Bell

    I noted that there is a slight grammar issue on the Completed Tasks tab when there is a task timeout. The description says "… just a delay in processing many task [sic] on one …"

  • 1
    Solved

    2021 online help not posted yet

    Peter DeRooy · 0 · Posted

    2021 online help not posted yet

    http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2021/index.htm#t=Welcome.htm

  • 1
    Answered

    How do I create a Project Query?

    Tom Kemp · 2 · Last reply by Tom Kemp

    I'm trying to generate a report (Project Query) of all the projects we have in Clarity with some information that we have as parameters in the Revit Project Information.

    I setup the table with the fields that I want to include.  When I try to create a report I get this error message:

  • 1
    Under Review

    Make Metric Management something that can be done by Coordinators

    Andreas Dieckmann · 0 · Posted

    A Project Coordinator (within a project) should be able to manage the metrics for their models.

    Currently it requires a Global Project Coordinator role.

  • 1
    Under Review

    Expose all data in metric guidance table

    Andreas Dieckmann · 1 · Last reply by Matt Mason

    It would be very helpful to see all data in the firm metric guidance table, not only when editing the metric's configuration.

  • 1
    Under Review

    Metrics: Distinguish between model types

    Model size is not always a good modifier for the metrics threshold values.

    At our office we usually deal with different model types: main models (contains rooms and all typical building elements, may be split into multiple models depending on size of project), auxiliary models (usually facades, roof structures etc.), site models, detail models (containing most of the detail views hence a lot of detail components, line work and annotation). All of these have typical characteristics which also means they produce very different metrics, e.g. a detail model containing even a single room should set off alarm bells whereas the

  • 1
    Under Review

    Let task servers learn custom paper sizes from host server

    Andreas Dieckmann · 1 · Last reply by Matt Mason

    We have some projects that need to use a lot of custom paper sizes. Managing those paper sizes on the host server and multiple task servers is fairly tedious and I was wondering if it wouldn’t be possible to have the task servers “learn” any new paper sizes for the ClarityPDF driver that were created on the host server.

  • 1
    Acknowledged

    Post Action inconsistency

    Joost Schlebaum · 1 · Last reply by Matt Mason

    Hi,

    We are having issues with the Post Action feature in both DWFx and PDF exports. I am trying to get 2 actions in order: upload to BIM360 AND copy files to a network folder. Clarity randomly either processes one, none or both (most of the times just one). Changing the order doesn't do anything. The Copy is on copy, not move, so that has been checked as well.

    Any ideas?

    Thanks,

    Joost Schlebaum