-
Under Review
Provide the option to set files to open "Last Viewed" for worksets
Currently, when Clarity collaborates a model to the cloud, it sets the open option to "Specify" for worksets. Would be good to have the ability to select "Last Viewed" or other options available in Revit.
-
Support more than 5 Revit versions back
We have a project which still runs in Revit 2018. We have a special agreement with Autodesk to extend our licenses for Revit 2018. We would like to run Clarity task for that project, but it has a limited number of Revit versions to support.
Can you consider some flexibility for supported Revit versions?
Thank you.
Evgeny.
-
Multiple ClarityPDF Drivers
I've been noticing a bottleneck in the scalability of Clarity as a PDF automation tool. You can increase the number of Revit sessions that can run at one time on your task machines, and you can vary the PDF drivers to allow for each session to run PDFs simultaneously. However, varying the drivers only makes sense if you're ok with not having the PDFs coming from Clarity follow the same standard.
Our use case requires all PDFs to be printed as individual sheets, which requires us to have the naming be consistent and clean. Only the Clarity PDF driver does
-
Select Revit models to detach and download
Regularly I need to download a copy of specific models and save them to a client's private drive without all of the attachments and folders.
-
Option to Create New Project from Untracked Models
Create an option to create a new project from Untracked models as well as ignore untracked models
-
Add office location to Project just like it is on All Projects
This would be very helpful!
-
filter options
Across the life cycle of our projects, the Filename (a.k.a. Target) often changes slightly depending on whether the file remains national or a state based file among other things. It would be really helpful if we had a way to filter files in my completed tasks list by "Contains" instead of "equals"? Or - can i check multiple in the filter list?
Also applies to when i want to know what tasks have been run on a particular file name but the path(project) might have been different. e.g.
-
Custom Warning on Task Launch
I think it would be a very nice feature to be able to pop-up a custom warning when the user launches a specific task. e.g. A Custom task that has built in feature to delete the file in destination location and replace it with an updated copy - Would be great to have a popup to use that says, "The Current File will be deleted and replaced with a new copy. Are you sure? " That kind of thing. To allow the user to back-out if they haven't considered everything required for this task etc.
-
Autogenerate email when a user is added to project
It would be helpful if an email could be autogenerated when a user is added to project. Email would include Project number, project name, if it is a RS project or B360, Revit version, and the role.
-
Batch/Multi-Project Delete
Would be great if there were a way to delete multiple projects at the same time. After running Clarity for several years things can get pretty cluttered and being able to delete older projects without having to do so 1 by 1 would be very useful.
-
Unified Sync - Bluebeam Studio
Expanding the unified sync functionality to allow syncing to/from Bluebeam Studio Projects.
-
Navisworks taks in BIM360/ACC
Hello, Really missing the ability to automate opening of NWF session and save as NWD in ACC/BIM360. So basically update Navisworks Conversion TASK so is support ACC/Bim360. Also same thing for AutoCAD to Navisworks TASK to support use in ACC/BIM360. Thanks
-
Enhanced workset filter
We can save a lot of time on tasks by filtering unneeded workset. That's why there is a filtering workset option on most tasks (if not every). Would it be possible to add a "preview" of the results (open or closed) of our filters? Just like the preview (test filter button) you have on the advanced file filter for projects.
Because right now we have to set the filters, run the task and wait for the it to end, assess the results and loop this process on every adjustment. Most of our coordinators don't take the time for this process
-
Move a claimed task to new server
Once a task get claimed but has not started processing is there any way for the host to periodically check and see if another server has become available and move that claimed task to the free server? We sometimes see a task sit in the claimed status for a long time waiting for a particularly long task to finish, but one or two other server are sitting idle.
-
Coordinator View tab - Task Chart
Allow the user to click on one of the bars in the chart to display list of all the tasks that ran at that time. Allow that list to be exported to csv or excel.
-
REST API support for metrics management
It would be great to have API support for the process of merging metrics. That would of course include retrieving lists of models that metrics are currently being stored for.
-
ACC upload split into multiple tasks
When uploading a large number of folders to ACC Clarity hits a quota limit. When uploading 1600 folder it took 9 hours and timed out. I split the uploading into multiple task each around 400 folders. This worked and only took around 2-3 hours to complete. Could we get an option to have clarity automatically split ACC uploads into multiple tasks?
-
Banner showing users role in project
When a user is in a project on the web portal, it might be useful for a banner showing the users assigned role. This could be easily overlooked by someone that is an admin and well acquainted. But for regular users and new users, they might not understand why they see what they see per project.
-
Send email on Autodesk Authentication expiry
This token likes to expire on Clarity Cloud. Apparently this does not occur on Clarity On-Prem. There is currently no way for us to know that it has expired. Our rep from ImaginIT sends me an email and tells me to go reauthenticate.
Proposed Solution: Send email to Company Administrator to go reauthenticate when this expires.
-
common task target fIlterable
Hi Guys, I'm wondering if the team is considering to expand on the common task target settings, to allow the target selection to be filterable like in the existing target selection task setup:
Thanks!