Planned
Navisworks Task - Add save to second folder
In the Navisworks task that is setup on a BIM 360 Design project it would be great to be able to post the NWC to a BIM 360 Folder as well as a local network folder. Right now you have only one option in the after task action. Like the Publish to Glue Task, Add a folder option in the task body.