New Topics

  • 1

    custom revit model file name

    Evgeny Kurbatov · 4 · Last reply by Craig Uptmor

    Hi,

    I use the Publish Revit Model task and want to customize the output filename by client's requirements. I can't find a Filename Builder or just an ability to type its name directly. Do I miss something?

    Thank you,

    Evgeny.

  • 4

    Frequency of Periodic Cleanup

    Steve Cardinal · 3 · Last reply by Andreas Dieckmann

    It would be great if we could control the schedule for the periodic cleanup on Task Servers. It would also be good to have a log for the cleanup results.

    Thanks!

  • 1

    Clarity feature request - task post-actions sequence option

    Evgeny Kurbatov · 0 · Posted

    Hello,

    Clarity runs post-actions in parallel, which is understood when we want to send files to BIM36, FTP and Google Drive. But there are scenarios when post-action should be performed one after another. For example, after generating files with Clarity I need to do the following:

    1. Delete old files in the target network folder. 2. Move the generated file to the target folder. 3. Rename files according client requirements. 4. Send files to shared location.

    The post-action should be performed in the given sequence. With the current parallel running the Clarity can delete the newly generated files in the

  • 5
    Planned

    Create [LocalNetworkPath] keyword

    Peter DeRooy · 1 · Last reply by Matt Mason

    For BIM 360 projects the [ProjectFolder] keyword can not be used in post action file copy because it is a BIM360 path.

    Create a new field in the New Project  "Local Network Path"  used for artifacts.

    Then it can be used in Post action tasks in folder paths.

    Example path for Local network project  -   [ProjectFolder]\..\..\CURRENT SET\PDF

    Example path for BIM360 project  -  [LocalNetworkPath]\..\..\CURRENT SET\PDF  

  • 1

    Show who lasted synced on BIM 360 models on the project page

    Peter DeRooy · 0 · Posted

    Right now it appears that the LastModifiedBy column on the BIM360 project home page is not filled out.

    Maybe have the clarity client collect this data?

  • 1

    Should Clarity be able to see the deleted files in BIM 360 Docs?

    Anthony Harwood · 1 · Last reply by Matt Mason

    Hi!

    I have deleted a model in BIM 360 Docs but Clarity still runs tasks on it. Has anyone else run into this? I tried to purge the model from the deleted area in BIM 360 and cannot see how to. Besides setting up a file filter for the project, is there anything else I can do? I can foresee this becoming a difficult to manage having to monitor deleted files and filtering them out of our tasks.

    Thanks in advance!

    TonyH

  • Use of Worksets within Clarity (incl BIM360)

    Matt Mason · 0 · Posted

    Since Clarity 2020, it's been possible to specify worksets on a given task. If you've run the RevitDBExport task, then you could see the worksets to choose from on the "Basic" tab.

    Starting in Clarity 2021, it is also possible to specify worksets with BIM360 projects (in this case you must have run the RevitDBExport task at least once).

    You can use these workset settings to:

    • Improve performance by not opening all worksets
    • Control visibility

    On the "Advanced" tab, it's also possible to specify wildcards - as well as negative wildcards (such as "don't show anything that includes the word

  • 31

    upload to Revizto

    Peter DeRooy · 4 · Last reply by Eric Stimmel

    At to Clarity the option to upload into Revisto.

    EllisDon is asking us to discuss using it for our projects.

  • 1

    How do you remove old task servers?

    R Robert Bell · 1 · Last reply by Matt Mason

    Our list of task servers in the server console show old task servers, either ones that have been renamed or others that have been decommissioned. I see no way to manage those nor does the documentation describe how the Task Server page is updated. Am I missing information somewhere?

  • 0
  • 1

    Slight Grammar Issue on the Completed Tasks Tab

    R Robert Bell · 2 · Last reply by R Robert Bell

    I noted that there is a slight grammar issue on the Completed Tasks tab when there is a task timeout. The description says "… just a delay in processing many task [sic] on one …"

  • 1
    Under Review

    Make Metric Management something that can be done by Coordinators

    Andreas Dieckmann · 0 · Posted

    A Project Coordinator (within a project) should be able to manage the metrics for their models.

    Currently it requires a Global Project Coordinator role.

  • 1
    Under Review

    Expose all data in metric guidance table

    Andreas Dieckmann · 1 · Last reply by Matt Mason

    It would be very helpful to see all data in the firm metric guidance table, not only when editing the metric's configuration.

  • 4
    Under Review

    Untracked Models: Ability to ignore models

    Andreas Dieckmann · 0 · Posted

    It would be nice to have an ignore option for the models listed in the Untracked Models section. This list keeps growing longer every day with temporary models that just add noise to the list.

  • 1
    Under Review

    Metrics: Distinguish between model types

    Model size is not always a good modifier for the metrics threshold values.

    At our office we usually deal with different model types: main models (contains rooms and all typical building elements, may be split into multiple models depending on size of project), auxiliary models (usually facades, roof structures etc.), site models, detail models (containing most of the detail views hence a lot of detail components, line work and annotation). All of these have typical characteristics which also means they produce very different metrics, e.g. a detail model containing even a single room should set off alarm bells whereas the

  • 1
    Under Review

    Let task servers learn custom paper sizes from host server

    Andreas Dieckmann · 1 · Last reply by Matt Mason

    We have some projects that need to use a lot of custom paper sizes. Managing those paper sizes on the host server and multiple task servers is fairly tedious and I was wondering if it wouldn’t be possible to have the task servers “learn” any new paper sizes for the ClarityPDF driver that were created on the host server.

  • 1

    Subst drive not in the list

    Evgeny Kurbatov · 2 · Last reply by Evgeny Kurbatov

    Hello,

    In our company we assess our Revit projects via the R: drive created with command subst R: \\svr\projects. This type of a network drive connection makes it working as a local drive for Revit, it doesn't convert it to UNC path. This strategy is chosen with purpose, we see advantages in this approach over the UNC path. We configured the Clarity server and task machines to have the R: as it appears for users. Unfortunately I cannot create a Clarity project with path targeting to the R: drive, it is not in the list:

    The substituted R: drive works

  • 2

    relative path

    Evgeny Kurbatov · 2 · Last reply by Evgeny Kurbatov

    A folder structure is constant (more or less) from project to project. It would be very helpful to specify a path for actions relative to the Revit project folder. It would save time on copying tasks from project to project - no need to adjust the UNC path for every project.

    Thank you.

  • 4

    I think it would be great for there to be an option to Auto-Sort Tasks Alphabetically.

    Nick Bower · 0 · Posted

    I find myself clicking the sort button a lot when creating and copying tasks.  Would be great if there was an auto-sort function

  • 1

    Can a project be changed from a local server to B360

    Tom Kemp · 1 · Last reply by Matt Mason

    We have a few of projects that are moving from local servers to B360.  At some point in the future they will likely transition back to our server.

    Is there a way to change a project that is already setup in Clarity to work on B360 instead of local files?  And then change it back?