New Topics

  • 3

    Add "ungroup all groups" in the PublishRevitModel task

    Peter DeRooy · 1 · Last reply by Peter DeRooy

    We have a need to export a model with all groups Ungrouped.

    Please add "ungroup all groups" in the PublishRevitModel task

  • 1

    Does Clarity interface with Newforma?

    Matthew Warren · 3 · Last reply by Matt Mason

    I am wondering if I can set a task in Clarity to post to Newforma and to pull a file from Newforma?

  • 1

    All Cloud Projects are not Synchronizing and may be Stale

    Nick Bower · 5 · Last reply by Nick Bower

    We are getting a message on all of our cloud projects stating that the project has not be synchronized since 8/12 and may be stale.  This seems to be true for all of our cloud projects and the date seems to be fairly consistent.  We have the latest updates for the Task and Host Servers.

  • 1

    Copy from internal Clarity server to external Clarity and vice versa

    Nicklas Østergaard · 3 · Last reply by Matt Mason

    Is it posibel to copy files from internal Clarity server to external Clarity and vice versa?

  • 1

    Sync Charts - Labels

    Dave Baldacchino · 0 · Posted

    The Sync charts (maybe others as well that report time) report in seconds. It would be nice to convert this to minutes & seconds instead. Also quite important to have in the label is the username for each data point.

  • 1
    Under Review

    A360Download Filter for file name

    Peter DeRooy · 0 · Posted

    Right now the A360 download can included subfolders and filter by file extension.

    Please add the option to filter by filename. Example is I only need to download 18-098 ARCH.rvt.

  • 1

    Viewing Reports and PDFs on Clarity

    Jessica Esteban · 1 · Last reply by Jessica Esteban

    I have been testing out the new tasks in preparation for launching company-wide.  When I run the Performance Advisor Report, sometimes the report shows and now most times, it just takes me to a blank page.  I do not understand why nothing is showing up, but the tasks show as completed.  

    In regards to creating PDFs to be able to view via the Clarity viewer, I am not able to view the PDF.  I keep getting the error that the PDF cannot be loaded and it will not load no matter how many times I hit reload.  

    Any and all

  • 1

    Unable to remove project number from project name

    Nick Bower · 0 · Posted

    Love the ability to sort by project number.  Thanks for implementing that.  We are having a problem editing the names of our existing projects now.  We used to put the project number in the name so we could effectively sort.  Since we don't have to do that now i would like to remove the project number from the front end of the project name.  Is there a cache file somewhere we need to purge or refresh or something to get these project names edited?  

    Here is a screenshot of what the project name looks like now....

    And then the message

  • 1

    Anyone using BIM360 Model Coordination?

    Matt Mason · 0 · Posted

    The Clarity team is looking at participating in an upcoming Forge Accelerator to implement some ideas for how Clarity might assist with the BIM360 Model Coordination standpoint (whether thru automation, metrics or reporting).

    We'd love to hear people's ideas if you're familiar with both systems.

    Thanks!

    Matt

  • 3
    Under Review

    Format Central Admin Lists

    Mike Underwood · 0 · Posted

    It would be nice if lists such as the task tables and user lists could be formatted to allow more than 20 rows at a time.  It is time-consuming to have to page through the multitude of records to get to the right row, even with sorting and filtering. 

  • 3

    Add Google Drive support

    Peter DeRooy · 2 · Last reply by Peter DeRooy

    Add Google Drive support for the post action copy / move option

  • 3
    Under Review

    Missing Link - add the option to ignore missing sub-links in links

    Peter DeRooy · 2 · Last reply by Hakim Boucekkine

    When clarity is running a PDF task with option for error on missing links on it fails if a link itself is missing an attached link. Please add the option to ignore missing sub-links in links 

  • 1

    BIM 360 project and live files

    I am having problems with a BIM 360 project, it won't read live files only shared and published models. I have tested with a new project and it reads live files OK. 

  • 9

    Take PDF output from Revit using Clarity and then upload to the Plans folder in BIM360

    Mike Rohwer · 4 · Last reply by Matt Mason

    https://forge.autodesk.com/en/docs/bim360/v1/tutorials/document-management/upload-document/

    It would be great if on a schedule Clarity could take PDF output of sheets and then upload against the Plans folder and not the Project Files folder.  

  • 1

    Error on task target missing

    Peter DeRooy · 0 · Posted

    When creating a new project we copy tasks from another project. 

    Once the task is scheduled and runs with a invaild Target it does not even create an error log to look at. This can also happen when a model is renamed. The scheduled task that is pointing to the old model name will not create an error that the target is missing.

  • 3

    Create a BIM360 Upload task to a BIM360 project

    Peter DeRooy · 1 · Last reply by Matt Mason

    Create a BIM360 upload task that does not require Revit. this would be great to able for a local workshare project to upload weekly PDF and model exchages to a BIM 360 Docs folder.

    The PDF upload option should be able to have wildcards like *.PDF for uploading singe page PDF's in batch mode.

  • 1
    Planned

    Navisworks Task - Add save to second folder

    Peter DeRooy · 1 · Last reply by Matt Mason

    In the Navisworks task that is setup on a BIM 360 Design project it would be great to be able to post the NWC to a BIM 360 Folder as well as a local network folder. Right now you have only one option in the after task action. Like the Publish  to Glue Task, Add a folder option in the task body.

  • 1

    Revit 2019 launched manually opens start.rvt on new task server

    Chris Schwanekamp · 1 · Last reply by Matt Mason

    I have just finished setting up a new task server and when starting Revit 2019 manually it opens start.rvt and shows the Clarity task log window as if it's processing a task.  It then sits there waiting until it times out and closes Revit.  I haven't been able to figure out what's causing this or how to "reset" the task that may be stuck on this machine?

  • 1

    DWG Task - Export Individually Problem

    Nick Bower · 3 · Last reply by Nick Bower

    We are having an issue with the DWG task in Clarity 2020.  The project is a 2018 Revit Project (A360/C4R).

    The task is using a Sheet Set with 3 views to be exported to DWG, then moved to a folder on our server.  When we set the Export Individually option to Yes and then utilize the flexible naming options, we get a single DWG that is very oddly named.  Attached are some screenshots of what we are seeing.  

    As soon as we set the Export Individually option back to No and change the DWG Filename to something standard (i.e. [Document].dwg)

  • The Quirks of Daylight Savings Time on Clarity

    Matt Mason · 0 · Posted

    How does Daylight Savings Time affect Clarity?

    For 2 hours per year (at least in the US) there are some odd Clarity issues. 

    When Time Springs Forward

    In the springtime, the clocks jump nearly instantly from 2am to 3am the night of Daylight savings time:

    • Any tasks set for 2:00 "might" run (small chance)
    • Any tasks set for 2:15, 2:30 or 2:45 will not run

    When Time Falls Back

    In the fall, the clocks jump from 3am back to 2am on the night of Daylight Savings Time:

    • Any tasks set to 2:00 am, 2:15, 2:30, 2:45 or 3am may get