Is there a good workflow for transferring files (all the files) from ProjectWise to BIM360/ACC?
Is there a good workflow for transferring files (all the files) from ProjectWise to BIM360/ACC?
thanks
Is there a good workflow for transferring files (all the files) from ProjectWise to BIM360/ACC?
thanks
Christian,
Apologies we missed this when it came in originally.
The best workflow we have for this is:
- ProjectWiseDownload task (downloading to a network folder path, even temporarily) - Copy Subfolders option:true.
- Add a BIM360 Upload Post Task Action (with the option to preserve folder structure).