      <title>Clarity 2026 Host System Requirements</title>
      <description><![CDATA[<p>Introduction</p>
<p>These prerequisites are required for all types of Clarity host.</p>
<p>This guide does not cover the full configuration and operation of the software – merely the host prerequisites.</p>
<p>Hardware/Operating System Requirements</p>
<p>Clarity requires a server-class Windows Server operating system to be the central web server. </p>
<p>A dedicated server is highly recommended.  Whether you will be using Revit Server in your environment or not, the prerequisites are the same for Clarity, so the System requirements below should be referenced.</p>
<p>I highly recommend that you go with the Performance requirements, but no less than the Value for either circumstance of concurrent users.</p>
<p>Projects must be stored on a physical drive meeting the requirements below.  NAS or[_cuted_]</p>]]></description>
      <pubDate>Mon, 22 Sep 2025 12:56:36 +0000</pubDate>
      <link>https://imaginit.helprace.com/i789-clarity-2026-host-system-requirements</link>
      <guid>https://imaginit.helprace.com/i789-clarity-2026-host-system-requirements</guid>
      <author>Sherry Pittman</author>
      <dc:creator>Sherry Pittman</dc:creator>
      <content:encoded><![CDATA[<h1><span style="text-decoration: underline;"><span style="color: #3366ff;"><b>Introduction</b></span></span></h1>
<p>These prerequisites are required for <strong><em>all types of Clarity host</em></strong>.</p>
<p>This guide does <b><em>not</em></b> cover the full configuration and operation of the software – merely the host prerequisites.</p>
<h1><span style="text-decoration: underline; color: #3366ff;"><b>Hardware/Operating System Requirements</b></span></h1>
<p>Clarity requires a server-class <a href="https://learn.microsoft.com/en-us/windows-server/get-started/whats-new-in-windows-server-2022" rel="nofollow"><strong>Windows Server</strong></a> operating system to be the central web server. </p>
<p>A <strong><em>dedicated</em></strong> server is highly recommended.  Whether you will be using Revit Server in your environment or not, the prerequisites are the same for Clarity, so the <a href="https://www.autodesk.com/support/technical/article/caas/sfdcarticles/sfdcarticles/System-requirements-for-Revit-2026-products.html?msockid=37b62c7b126b64c91a12382f13396502" target="_blank" rel="nofollow">System requirements </a>below should be referenced.</p>
<p>I highly recommend that you go with the <strong>Performance</strong> requirements, but <strong><em>no less</em></strong> than the <strong>Value</strong> for either circumstance of concurrent users.</p>
<p>Projects must be stored on a physical drive meeting the requirements below.  NAS or SAN devices will not work and they are also <em>not supported</em> by Autodesk at this time.  Please refer to the following Knowledge base articles for additional information</p>
<ul>
<li><a href="https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Autodesk-support-for-Network-Attached-Storage-NAS-and-Storage-Area-Networks-SAN.html" rel="nofollow">https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Autodesk-support-for-Network-Attached-Storage-NAS-and-Storage-Area-Networks-SAN.html</a></li>
<li><a href="https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Support-for-non-Microsoft-networks.html" rel="nofollow">https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Support-for-non-Microsoft-networks.html</a></li>
</ul>
<h5><span style="text-decoration: underline;"><b><strong>Hardware:</strong></b></span></h5>
<p><img id="" src="https://imaginit.helprace.com/resources/tmp/2656444/1758545201/MTY6AvLohwxBPOrkoD_90B2s5re0b168phkif2HsLEZ3c2wVQSTgEItkPJUxIiiIVsy-fXyQH-zVDqhj2fLUXgg3vA%7E%7E/image-1758545204740.png" alt="image-1758545204740.png" data-file="___chdfid_2656444___"></p>
<h5><br>
<b><span style="text-decoration: underline;">Hard drive space: </span></b></h5>
<p>Roughly 12 GB of free space for the Clarity installation, with <strong><em>substantial</em></strong> additions dependent on the amount and size of projects and tasks being utilized.</p>
<p>There is still a good amount of information that needs space on the C drive, even if the Projects and Artifacts are assigned to a different drive. </p>
<h3><b><u>Recommended Minimum</u></b></h3>
<p><span style="color: #3366ff;"><b><strong><em>Minimum</em> 500 GB C drive</strong> </b></span>allocation to avoid issues later related to not enough hard drive space on the C drive. </p>
<p><strong><u>Additional drive for Data</u></strong> (<span style="color: #3366ff;"><b>Projects, Artifacts, Backups and Archives</b></span> etc)</p>
<p><strong><em>If also being stored on the C drive, increase the drive size accordingly</em></strong>.</p>
<p>We do <strong><em>not</em></strong> recommend that you install the Clarity Task Server software on the host since it is not a supported OS, but If you choose to use the host as a task server, additional drive space is required.</p>
<h4><span style="text-decoration: underline;"><b>RAM: </b></span></h4>
<p>This is a difficult question, because it is dependent on the number of users, projects, and size of projects being managed. This is particularly important if the server is going to be performing Revit operations, the size of the Revit RAM requirement often dwarfs the other requirements.</p>
<h3><b><u>Recommended Minimum</u></b></h3>
<p><span style="color: #3366ff;"><b>Minimum </b></span><strong><span style="color: #3366ff;"><b>16gb of ram</b></span> on the host.</strong> </p>
<p><strong><u>Note:</u></strong>  If you plan on using the host as a task server, refer to the ram and hard drive space for <b><a href="https://www.autodesk.com/support/technical/article/caas/sfdcarticles/sfdcarticles/System-requirements-for-Autodesk-Revit-products.html?us_oa=dotcom-us&amp;us_si=2a8f0802-6dff-41fe-a4a7-3f6d0d607070&amp;us_st=Revit%202024%20system%20requirements" rel="nofollow">Revit</a>.</b></p>
<h1><span style="text-decoration: underline;"><span style="color: #3366ff;"><b>Virtualization</b></span></span></h1>
<p>Most Clarity server deployments have taken place on Virtual Machines. Clarity supports VMware and Hyper-V based virtual machines.</p>
<p><span style="color: #3366ff;"><b>You must ensure that the virtual machine has sufficiently performing processor, memory, and disk resources for appropriate performance.</b></span></p>
<p><strong><u>Note:</u></strong></p>
<p><b>Anyone going with a Virtual setup should be asked how the IOPS performance of their setup would compare to the kind of physical drive Autodesk is looking for.</b></p>
<h1><span style="text-decoration: underline;"><span style="color: #3366ff;"><b>Microsoft SQL Server</b></span></span></h1>
<p><strong>Clarity 2026 provides Microsoft SQL Express 2017</strong> as its database.  <strong>SQL Server Express limits</strong> the <strong>maximum</strong> database size to <strong>10GB</strong>.</p>
<p><b><span style="color: #3366ff;"><strong><em>If you plan to have more than 100 active projects</em></strong></span></b><em><b><span style="color: #3366ff;">,</span></b> you may wish to consider a full SQL Server license (or a separate SQL Server). Microsoft SQL Server version 2016 thru 2022 are supported.</em></p>
<h3><b>Can I Use My Existing SQL Server?</b></h3>
<p>We are often asked if it is permissible to use an <em>existing</em> full version of Microsoft SQL Server (on a corporate server).</p>
<p>While this environment <em>should</em> work, it is not a fully tested configuration as of yet.</p>
<p>If this is an important issue, please raise it with your primary IMAGINiT contact.</p>
<h1><span style="text-decoration: underline; color: #3366ff;"><b>Software/OS Prerequisites</b></span></h1>
<p>Before deploying your Clarity Server, you must have the following prerequisite configuration set up for your Clarity Host.  The Revit Server prerequisites are required for all Clarity Host installations regardless of if you are going to be using Revit Server.</p>
<p>Contact support for more detailed information:  <a href="mailto:support@rand.com" rel="nofollow">support@rand.com</a></p>
<p>Please reference the following Autodesk article for installing prerequisites on <strong>Windows Server  </strong><a href="https://help.autodesk.com/view/RVT/2026/ENU/?guid=GUID-F0CFA1FA-166F-4693-AD2E-E1BA34A7F844" target="_blank" rel="nofollow"><strong>2016</strong></a> <strong>,  </strong><a href="https://help.autodesk.com/view/RVT/2026/ENU/?guid=GUID-7ECB1D45-7D04-4552-8EC2-7E5996D5DFFB" target="_blank" rel="nofollow"><strong>2019</strong></a> <strong> or</strong> <a href="https://help.autodesk.com/view/RVT/2026/ENU/?guid=GUID-BF12B6F3-F69B-4ABC-8F37-52A83945DB68" target="_blank" rel="nofollow"><strong>2022</strong></a> or Server 2025* (64-bit) *with limited internal testing<strong> </strong></p>
<p><strong>Revit Server Installs</strong> (Optional)</p>
<ul>
<li>If you are going to be using <strong>Revit Server</strong> with Clarity, please install all necessary versions of Revit Server prior to the Clarity install and verify that you can get to the Revit Server admin without error.  Do <strong><em>not</em></strong> create any projects yet.</li>
</ul>
<p><strong>Autodesk Revit</strong></p>
<p>If you are <strong><em>not</em></strong> using the host as a task server it is not necessary to install Revit.</p>
<h1><span style="text-decoration: underline; color: #3366ff;"><b>User Identity</b></span></h1>
<p>Because Clarity will likely need to access files on your network, you should decide in advance what <strong>UserId</strong> clarity should run under in order to give the appropriate permissions. </p>
<p>By default, Clarity will run as a low-privilege system account on the local machine – but that account will likely not have sufficient access to retrieve files from the network.</p>
<p>To manage this access appropriately, <strong>IMAGINiT</strong> <strong>recommends defining a domain account for your “Clarity User” – which will define the permissions for the Clarity application.</strong></p>
<p>Please reference the <a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/index.htm#rhsearch=security&amp;rhsyns=%20&amp;t=System_Setup%2FClarity_System_Identity_Setup.htm" rel="nofollow">Help</a> link or the <strong><u>Clarity Security Principle Setup</u></strong> document for the complete steps to configure Clarity to use this “Clarity User” for the following:</p>
<ul>
<li>CentralAdministrator Application Pools</li>
<li>Clarity Monitoring Windows Service</li>
<li>Microsoft SQL Server Database</li>
<li>Clarity ADSync</li></ul>]]></content:encoded>
    </item>
    <item>
      <title>Clarity 2026 Task Server Requirements</title>
      <description><![CDATA[<p> </p>
<p>We recommend that the task servers be at least comparable to workstations used in production, if not stronger, especially if you are planning on running multiple sessions of Revit and or multiple logins (not typically recommended due to permission issues).  When referring to the Revit System Requirements, do not go with anything lower than the Value, but Performance is recommended, or value with double the ram if you have large models with multiple links. If you choose to use virtualization, be aware that graphic intense tasks will not perform as well without a physical graphics card.  Refer to the Virtualization section below. LICENSE COMPLIANCE Task servers are[_cuted_]</p>]]></description>
      <pubDate>Thu, 26 Feb 2026 16:29:40 +0000</pubDate>
      <link>https://imaginit.helprace.com/i757-clarity-2026-task-server-requirements</link>
      <guid>https://imaginit.helprace.com/i757-clarity-2026-task-server-requirements</guid>
      <author>Sherry Pittman</author>
      <dc:creator>Sherry Pittman</dc:creator>
      <content:encoded><![CDATA[<div class="b-toolbar b-toolbar_reply"> </div>
<div class="b-topic__text">
<h6>We recommend that the task servers be <span style="color: #3366ff;"><strong><em>at least</em></strong> <b>comparable to workstations used in production</b></span>, if not stronger, especially if you are planning on running multiple sessions of Revit and or multiple logins (not typically recommended due to permission issues). </h6>
<h6>When referring to the <b>Revit System Requirements,</b> do not go with anything lower than the Value, but <strong>Performance is recommended</strong>, or value with double the ram if you have large models with multiple links.</h6>
<h6>If you choose to use <b>virtualization,</b> be aware that graphic intense tasks will not perform as well without a physical graphics card.  Refer to the <b>Virtualization</b> section below.</h6>
<h5><b>LICENSE COMPLIANCE</b></h5>
<h6>Task servers are essentially "filling in" for a physical user, so license compliance still applies to the task servers.  <span style="color: #3366ff;"><b>Please be aware that it is your responsibility to bring valid Autodesk licenses to each task server in order to stay in compliance.</b></span></h6>
<h2><b>System Requirements</b></h2>
<h6>Please refer to the link below for specific information.</h6>
<h6><b><a href="https://www.autodesk.com/support/technical/article/caas/sfdcarticles/sfdcarticles/System-requirements-for-Revit-2026-products.html?us_oa=dotcom-us&amp;us_si=eb84594d-fc82-4644-8266-75f4c3e94750&amp;us_st=Revit%202026%20system%20requirements" target="_blank" rel="nofollow">Revit System Requirements</a></b></h6>
<h2><b>Supported Versions of Revit</b></h2>
<h5><b>Revit 2022-2026</b></h5>
<p><i><b>If you still need to process Revit 2021 projects</b></i>, please leave a task server on Clarity 2025.1 to accommodate those tasks.</p>
<h2><b>Software Licensing</b></h2>
<p>Any task server being used to process tasks from Clarity will need the ability to run a licensed copy of Revit (network, borrowed or stand-alone), which will open up Revit models either as detached copies or live models depending on the project and settings for task processing. </p>
<p>Once installed, please launch all versions to make sure there are no licensing or other dialog boxes that need to be addressed.</p>
<h2><b>Hard Drive</b></h2>
<p><b><strong>Minimum</strong> 500gb C drive</b>.  For 360 projects, the cache can quickly consume space on the hard drive and cause issues on the task server.  If you are running a large number of tasks, or your projects are overly large you should probably bump up the size of the C drive.</p>
<p>If you are running multiple sessions of Revit, increase this value accordingly.</p>
<h2><b>Ram</b></h2>
<p>Autodesk has historically recommended RAM in the amount of <em>20 times</em> the on-disk size of the file you have open plus the combined total of all of the Revit links.***</p>
<p><strong><u>How to Calculate Ram Requirements</u></strong></p>
<p><a href="https://knowledge.autodesk.com/support/revit-products/troubleshooting/caas/sfdcarticles/sfdcarticles/Revit-How-to-calculate-required-RAM-specific-to-a-project-size.html" rel="nofollow">https://knowledge.autodesk.com/support/revit-products/troubleshooting/caas/sfdcarticles/sfdcarticles/Revit-How-to-calculate-required-RAM-specific-to-a-project-size.html</a></p>
<p>***Models created in previous versions of Revit may require more available memory for the one-time upgrade process.</p>
<h2><b>Graphics Card</b></h2>
<p>It is recommended that you have a suitable graphics card as recommended in the <strong>Revit System requirements.</strong></p>
<h2><b>Virtualization</b></h2>
<p>Clarity supports VMware and Hyper-V based virtual machines. You must ensure that the virtual machine has a sufficiently performing processor, memory and disk resources for appropriate performance.</p>
<ul>
<li>Anyone going with a Virtual setup should be consider the IOPS performance of how their setup would compare to the kind of physical drive Autodesk is looking for.</li>
<li>As mentioned previously, graphic intense tasks such as pdf, dwg, dwf and navis <strong><em>will not perform as well</em></strong> as a machine with a recommended physical graphics card. This will impact the time it takes to process the task since it will be using softwaremode graphics.  This process time can be considerable compared to a physical machine depending on your setup.</li>
</ul>
<p>We did a Clarity Healthcheck with one firm using VMs with a graphics card, and we did a PDF benchmark with 164 sheets on a megaproject.
<br>
<br>
<b>Physical server: 5 hours</b>
<br>
<b>Virtual server: 16 hours</b>
<br>
<br>
(most of that difference – 10 hours - was in 4 particularly graphically intense sheets).
<br>
<br>
We also did the RFO Revit benchmarks on a VM task server and two production machines:
<br>
<br>
<img src="//imaginit.helprace.com/resources/WlnyGpSq6UEx1Pg0SieYgTmOHwpDFCT0QmhgttXf-om1pngwPL87f2RtJbytL7bA-WJCfMAnEtsIcOFqBjHNOw%7E%7E/Benchmark.png" alt="" width="500" data-file="___chdfid_2640423___">
<br>
<br>
This is not as drastic a difference, but it is 42% slower to print relatively basic sheets in the benchmark.</p>
<h3><b>Task Server Login Requirements for Revit</b></h3>
<p>The task server will need to be logged in at all times, in an active Windows session, in order for tasks to process and perform automations like selecting projects in the Desktop Connector.  The Task User is any user who is logged on to a task server.  Revit will run as that user, and the permissions will be that of the user.  The user logged into the machine must have permissions to read/write/change to all necessary folders.</p>
<h3><b>Task Server Requirements for Clarity Windows Task Server Service</b></h3>
<p>The service logon should be assigned to the designated Clarity account, typically a service account.</p>
<h3><b>Software Requirements</b></h3>
<ul>
<li><b>Revit</b>
<ul>
<li>All versions needed for projects with tasks being processed on this task server. (2022-2026)</li>
<li>Updates equal to the updates on users machines, preferably the most current</li>
<li>Since most 360 addins are installed as part of the update it is important to remain current.</li>
<li><i><b>ONLY ADDINS NEEDED FOR TASKS</b></i></li>
</ul>
</li>
</ul>
<p>Once installed, please launch all versions to make sure there are no licensing or other dialog boxes that need to be addressed.</p>
<ul>
<li><b>Autocad</b>
<ul>
<li>We will use the highest version installed so it is only necessary to install one version of the flavor of Autocad you wish to use.</li>
<li>Install all necessary object enablers</li>
<li>Refer to the following blog posts for additional requirements:  
<ul>
<li><a href="https://imaginit.helprace.com/i653-clarity-windows-task-server-settings" target="_blank">https://imaginit.helprace.com/i653-clarity-windows-task-server-settings</a></li>
<li><a href="https://imaginit.helprace.com/i493-clarity-windows-task-server-pre-requisites-for-autocad-nw-conversion" target="_blank">https://imaginit.helprace.com/i493-clarity-windows-task-server-pre-requisites-for-autocad-nw-conversion</a></li>
</ul>
</li>
</ul>
</li>
<li><b>Navisworks Manage or Simulate</b>
<ul>
<li>All versions needed for projects with tasks being processed on this task server.</li>
<li>Updates equal to the updates on users machines, preferably the most current</li>
</ul>
</li>
</ul>
<p><b>360 Requirements</b></p>
<p>In order for Clarity to access 360 cloud models, it is necessary for the Autodesk identity to have a valid license to access the live cloud model. </p>
<p>Due to Autodesk project selection limitation in the <b>16.x version of the Desktop Connector</b>, we have a mechanism to auto-select projects which requires a configuration setting in the Clarity task tray.  If you don't use the desktop connector to link or access files you do not need to install it.</p>
<p><a href="https://imaginit.helprace.com/i563-clarity-2024-task-server-config-to-auto-select-360-dc-projects" target="_blank">https://imaginit.helprace.com/i563-clarity-2024-task-server-config-to-auto-select-360-dc-projects</a></p>
<h5><b>The ADSSO and Desktop Connector</b></h5>
<ul>
<li><a href="https://knowledge.autodesk.com/support/bim-360/learn-explore/caas/CloudHelp/cloudhelp/ENU/About-BIM360/files/about-bim-360-design/About-BIM360-about-bim-360-design-bring-your-own-subscription-html-html.html" rel="nofollow">https://knowledge.autodesk.com/support/bim-360/learn-explore/caas/CloudHelp/cloudhelp/ENU/About-BIM360/files/about-bim-360-design/About-BIM360-about-bim-360-design-bring-your-own-subscription-html-html.html</a></li>
</ul>
<ul>
<li>Update the Autodesk Single Sign On (SSO)</li>
</ul>
<ul>
<li><b><a href="https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/simplecontent/content/autodesk-single-sign-component-update-for-2020-2021-product-versions.html" rel="nofollow">This article</a></b> will walk you through the installer steps to make sure the user's SSO is up to date.Update the Autodesk Desktop Connector and sign in through that on the task servers
<h6><b>Recommended version:</b> <b>Desktop Connector</b>: <a href="https://imaginit.helprace.com/i734-clarity-task-servers-and-the-desktop-connector" target="_blank">https://imaginit.helprace.com/i734-clarity-task-servers-and-the-desktop-connector</a></h6>
</li>
</ul>
<p><span style="text-decoration: underline;"><b style="font-size: 20px; font-family: Arial, Helvetica, sans-serif;">Available Tasks</b></span></p>
<h6>For <b>Revit/Autocad/Navisworks tasks</b>, the designated 360 identity will need to be logged in via the Autodesk product or the desktop connector.</h6>
<h6>For <b>Clarity Windows task server tasks</b> will use the Oauth identity assigned to the project in Clarity.</h6>
<p>Below is a screen shot of available tasks, keep in mind that custom tasks may vary from what you see and some may require a different module for Clarity.</p>
<p><img id="" src="//imaginit.helprace.com/resources/Fp3_Zb5NYkIyUJZO00wiees41Tzulx9HEwDk8Zdv7CbqOkSDlJRqfOG-c-u3aOjNx6IquGN0eHKCRZU-RmRPIQ%7E%7E/image-1752766391310.png" alt="image-1752766391310.png" width="1000" data-file="___chdfid_2640422___"></p>
<h2><b>Post Task Actions</b></h2>
<p>Historically, output files of the task would be sent from the task server to the host server, then the host server would deliver them to their final destination via the Post Task Action.</p>
<p>However, starting in Clarity 2023, Post Task Actions will run on the task server itself by default - so the files no longer need to be sent back to the host first. This will be done unless the option to "Perform Post Task Actions Locally" is un-checked in the task server options panel.</p>
<ul>
<li><a href="https://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/index.htm#t=Admin_%26_Coordinators_Guide%2FTask_Automation%2FPost_Task_Actions%2FAconex_Upload.htm&amp;rhsearch=aconex&amp;rhhlterm=aconex" target="_blank" rel="nofollow">Aconex Upload</a></li>
<li><a href="https://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Upload_to_BIM360.htm" target="_blank" rel="nofollow">BIM360 Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/BIMTrack_Upload.htm" rel="nofollow">BIMTrack Upload</a></li>
<li><a href="https://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025.1/index.htm#t=Admin_%26_Coordinators_Guide%2FTask_Automation%2FPost_Task_Actions%2FBluebeam_Upload.htm&amp;rhsearch=Bluebeam%20upload&amp;rhhlterm=bluebeam%20upload%20uploading" target="_blank" rel="nofollow">Bluebeam Upload (2025.1)</a></li>
<li><a href="https://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Upload_to_BOX.htm" target="_blank" rel="nofollow">Box Upload</a></li>
<li><a href="https://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Upload_to_DropBox.htm" target="_blank" rel="nofollow">Dropbox Upload</a></li>
<li><a href="https://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025.1/index.htm#t=Admin_%26_Coordinators_Guide%2FTask_Automation%2FPost_Task_Actions%2FEgnyte_Upload.htm&amp;rhsearch=egnyte&amp;rhhlterm=egnyte" target="_blank" rel="nofollow">Egnyte Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Google_Drive_Upload.htm" target="_blank" rel="nofollow">Google Drive</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Microsoft_OneDrive_Upload.htm" target="_blank" rel="nofollow">Microsoft OneDrive Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Microsoft_Sharepoint_Online_Upload.htm" target="_blank" rel="nofollow">Microsoft Sharepoint Online Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Microsoft_Teams_Upload.htm" target="_blank" rel="nofollow">Microsoft Teams Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Move_Copy_Files.htm" rel="nofollow">Move/Copy Files</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/FTP_Files.htm" target="_blank" rel="nofollow">Post to FTP</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Procore_Upload.htm" target="_blank" rel="nofollow">Procore Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/ProjectWise_Checkin.htm" target="_blank" rel="nofollow">ProjectWise Check in </a>(Requires Projectwise Module)</li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Run_Script.htm" target="_blank" rel="nofollow">Run Script File</a></li>
</ul>
<h3><b>Multiple Actions</b></h3>
<p>It is now possible to configure multiple post task actions for each task. Please note that some combinations of tasks in some orders may be not be compatible with each other.  For example, if the first action moves the files to another location, the second action will not know that the files have moved.</p>
<h2><span style="text-decoration: underline;"><b>Addins</b></span></h2>
<p>We recommend <i><b>only installing addins needed for tasks</b></i>. </p>
<h6><span style="color: #ff0000;"><b><span style="text-decoration: underline;"><i>DO NOT INSTALL</i></span> THE <span style="color: #3366ff;">CLARITY CLIENT</span> OR THE <span style="color: #3366ff;">IMAGINIT REVIT UTILITIES</span> ON THE TASK SERVER!</b></span></h6>
<p>Some addins, including some from Autodesk, have been known to cause ownership issues when processing tasks.</p>
<p>Please only install the add ins per version as needed for the following type of tasks that you plan to run:</p>
<h4><b>Navisworks Exporter</b></h4>
<ul>
<li><a href="https://www.autodesk.com/products/navisworks/3d-viewers#navisworks-nwc-export-utility" rel="nofollow">https://www.autodesk.com/products/navisworks/3d-viewers#navisworks-nwc-export-utility</a></li>
</ul>
<h4><b>Navisworks Glue</b></h4>
<ul>
<li>Task requires Glue Configuration setup in Clarity
<ul>
<li>To obtain API keys for your company, contact your Autodesk Account Administrator or <a href="mailto:bim360glue.keyrequest@autodesk.com" rel="nofollow">keyrequest@autodesk.com</a></li>
</ul>
</li>
</ul>
<h4><b>Model Review</b></h4>
<p><strong>The ModelReview tool was discontinued as of the 2021 version. Please refer to the BIM Interoperability Tools ModelChecker going forward.</strong></p>
<h4><b>IFC (Open Source IFC Exporter)</b></h4>
<ul>
<li><a href="https://apps.autodesk.com/" rel="nofollow">https://apps.autodesk.com/</a></li>
<li><a href="https://github.com/Autodesk/revit-ifc/releases" target="_blank" rel="nofollow">https://github.com/Autodesk/revit-ifc/releases</a></li>
</ul>
<h4><b>BIM Interoperability Tools</b></h4>
<h6><a href="https://imaginit.helprace.com/i736-bim-interoperability-tools-supported-versions">https://imaginit.helprace.com/i736-bim-interoperability-tools-supported-versions</a></h6>
<ul>
<li>Clarity supports a <b>specific build of this tool</b>, so please refer to the blog post to see the supported versions for each version of Revit for the version of Clarity you have installed on the task servers</li>
<li><a href="http://manage.autodesk.com/" rel="nofollow">http://manage.autodesk.com</a></li>
</ul>
<h4><b>Publish to Autodesk Viewer</b></h4>
<ul>
<li>Requires additional setup also
<ul>
<li>You will first need to request a key from this site <a href="https://developer.autodesk.com/" rel="nofollow">https://developer.autodesk.com</a></li>
</ul>
</li>
</ul>
<h4><b>Collaboration for Revit</b></h4>
<ul>
<li>This is now included in the software and updates.</li>
</ul>
<h4><b>Dynamo</b></h4>
<p>Only one version of Dynamo should be installed on the task server.</p>
<h4><b>PyRevit</b></h4>
<ul>
<li><a href="https://github.com/pyrevitlabs/pyRevit/releases" target="_blank" rel="nofollow">https://github.com/pyrevitlabs/pyRevit/releases</a></li>
</ul>
<h2><span style="text-decoration: underline;"><b>Tasks Requiring Extra Configuration</b></span></h2>
<h4><b>Revit Database Export Task</b></h4>
<p>If you are going to be running this task on a remote task server it will be necessary to do some additional configuration on the host.</p>
<p><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2026/index.htm#t=White_Papers%2FRemote_SQL_Database_Access.htm&amp;rhsearch=Revit%20DBExport&amp;rhsyns=%20" target="_blank" rel="nofollow">http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2026/index.htm#t=White_Papers%2FRemote_SQL_Database_Access.htm&amp;rhsearch=Revit%20DBExport&amp;rhsyns=%20</a></p>
<h4><b>Autocad PDF or Navis Conversion tasks</b></h4>
<p>This Windows task requires additional configuration, please refer to the following document:</p>
<p><a href="https://imaginit.helprace.com/i493-clarity-windows-task-server-pre-requisites-for-autocad-nw-conversion" target="_blank">https://imaginit.helprace.com/i493-clarity-windows-task-server-pre-requisites-for-autocad-nw-conversion</a></p></div>]]></content:encoded>
    </item>
    <item>
      <title>Clarity 2025 Host System Requirements</title>
      <description><![CDATA[<p>Introduction</p>
<p>These prerequisites are required for all types of Clarity host.</p>
<p>This guide does not cover the full configuration and operation of the software – merely the host prerequisites.</p>
<p>Hardware/Operating System Requirements</p>
<p>Clarity requires a server-class Windows Server operating system to be the central web server. </p>
<p>A dedicated server is highly recommended.  Whether you will be using Revit Server in your environment or not, the prerequisites are the same for Clarity, so the System requirements below should be referenced.</p>
<p>I highly recommend that you go with the Performance requirements, but no less than the Value for either circumstance of concurrent[_cuted_]</p>]]></description>
      <pubDate>Tue, 04 Jun 2024 14:20:00 +0000</pubDate>
      <link>https://imaginit.helprace.com/i641-clarity-2025-host-system-requirements</link>
      <guid>https://imaginit.helprace.com/i641-clarity-2025-host-system-requirements</guid>
      <author>Sherry Pittman</author>
      <dc:creator>Sherry Pittman</dc:creator>
      <content:encoded><![CDATA[<h1><span style="text-decoration: underline; color: #3366ff;"><b>Introduction</b></span></h1>
<p>These prerequisites are required for <strong><em>all types of Clarity host</em></strong>.</p>
<p>This guide does <b><em>not</em></b> cover the full configuration and operation of the software – merely the host prerequisites.</p>
<h1><span style="text-decoration: underline; color: #3366ff;"><b>Hardware/Operating System Requirements</b></span></h1>
<p>Clarity requires a server-class <a href="https://learn.microsoft.com/en-us/windows-server/get-started/whats-new-in-windows-server-2022" rel="nofollow"><strong>Windows Server</strong></a> operating system to be the central web server. </p>
<p>A <strong><em>dedicated</em></strong> server is highly recommended.  Whether you will be using Revit Server in your environment or not, the prerequisites are the same for Clarity, so the <a href="https://www.autodesk.com/support/technical/article/caas/sfdcarticles/sfdcarticles/System-requirements-for-Revit-2025-products.html#revitserver" rel="nofollow">System requirements</a> below should be referenced.</p>
<p>I highly recommend that you go with the <span style="color: #00ccff;"><strong>Performance</strong></span> requirements, but <strong><em>no less</em></strong> than the <span style="color: #0000ff;"><strong>Value</strong></span> for either circumstance of concurrent users.</p>
<p>Projects must be stored on a physical drive meeting the requirements below.  NAS or SAN devices will not work and they are also <em>not supported</em> by Autodesk at this time.  Please refer to the following Knowledge base articles for additional information</p>
<ul>
<li><a href="https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Autodesk-support-for-Network-Attached-Storage-NAS-and-Storage-Area-Networks-SAN.html" rel="nofollow">https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Autodesk-support-for-Network-Attached-Storage-NAS-and-Storage-Area-Networks-SAN.html</a></li>
<li><a href="https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Support-for-non-Microsoft-networks.html" rel="nofollow">https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Support-for-non-Microsoft-networks.html</a></li>
</ul>
<p><strong>Hardware:</strong></p>
<p><br>
<img src="//imaginit.helprace.com/resources/tmp/2414534/1717509227/MTY6Sy3M4pTZVx7WMBTBTSZ7bI5k8h70P0Cry3TMsfPRgw61NdnJJ1vvynkZdfUFrSsgySu2Pxutr2TEtGxCAaX0WA%7E%7E/25%20SR%201.png" alt="" width="650" data-file="___chdfid_2414534___"></p>
<h1><span style="text-decoration: underline; color: #3366ff;"><b>Hard drive space: </b></span></h1>
<p>Roughly 12 GB of free space for the Clarity installation, with <strong><em>substantial</em></strong> additions dependent on the amount and size of projects and tasks being utilized.</p>
<p>There is still a good amount of information that needs space on the C drive, even if the Projects and Artifacts are assigned to a different drive. </p>
<h3><b><u>Recommended Minimum</u></b></h3>
<p><span style="color: #00ccff;"><strong><em>Minimum</em> 500 GB C drive</strong></span> allocation to avoid issues later related to not enough hard drive space on the C drive. </p>
<p><strong><u>Additional drive for Data</u></strong> (Projects, Artifacts, Backups and Archives etc)</p>
<p><span style="color: #00ccff;"><strong><em>If also being stored on the C drive, increase the drive size accordingly</em></strong>.</span></p>
<p>We do <strong><em>not</em></strong> recommend that you install the Clarity Task Server software on the host since it is not a supported OS, but If you choose to use the host as a task server, additional drive space is required.</p>
<h1><span style="text-decoration: underline; color: #3366ff;"><b>RAM: </b></span></h1>
<p>This is a difficult question, because it is dependent on the number of users, projects, and size of projects being managed. This is particularly important if the server is going to be performing Revit operations, the size of the Revit RAM requirement often dwarfs the other requirements.</p>
<h3><b><u>Recommended Minimum</u></b></h3>
<p>Minimum <strong>16gb of ram on the host.</strong> </p>
<p><strong><u>Note:</u></strong>  <span style="background-color: #ffcc00;">If you plan on using the host as a task server, refer to the ram and hard drive space for <b><a style="background-color: #ffcc00;" href="https://www.autodesk.com/support/technical/article/caas/sfdcarticles/sfdcarticles/System-requirements-for-Autodesk-Revit-products.html?us_oa=dotcom-us&amp;us_si=2a8f0802-6dff-41fe-a4a7-3f6d0d607070&amp;us_st=Revit%202024%20system%20requirements" rel="nofollow">Revit</a>.</b></span></p>
<h1><span style="text-decoration: underline; color: #3366ff;"><b>Virtualization</b></span></h1>
<p>Most Clarity server deployments have taken place on Virtual Machines. Clarity supports VMware and Hyper-V based virtual machines.</p>
<p><b>You must ensure that the virtual machine has sufficiently performing processor, memory, and disk resources for appropriate performance.</b></p>
<p><strong><u>Note:</u></strong></p>
<p><span style="color: #00ccff;"><b>Anyone going with a Virtual setup should be asked how the IOPS performance of their setup would compare to the kind of physical drive Autodesk is looking for.</b></span></p>
<h1><span style="text-decoration: underline; color: #3366ff;"><b>Microsoft SQL Server</b></span></h1>
<p><strong>Clarity 2025 provides Microsoft SQL Express 2017</strong> as its database.  <strong>SQL Server Express limits</strong> the <strong>maximum</strong> database size to <strong>10GB</strong>.</p>
<p><strong><em>If you plan to have more than 100 active projects</em></strong><em>, you may wish to consider a full SQL Server license (or a separate SQL Server). Microsoft SQL Server version 2016 thru 2022 are supported.</em></p>
<h3><span style="text-decoration: underline;"><b>Can I Use My Existing SQL Server?</b></span></h3>
<p>We are often asked if it is permissible to use an <em>existing</em> full version of Microsoft SQL Server (on a corporate server).</p>
<p>While this environment <em>should</em> work, it is not a fully tested configuration as of yet.</p>
<p>If this is an important issue, please raise it with your primary IMAGINiT contact.</p>
<h1><span style="text-decoration: underline; color: #3366ff;"><b>Software/OS Prerequisites</b></span></h1>
<p>Before deploying your Clarity Server, you must have the following prerequisite configuration set up for your Clarity Host.  The Revit Server prerequisites are required for all Clarity Host installations regardless of if you are going to be using Revit Server.</p>
<p>Contact support for more detailed information:  <a href="mailto:support@rand.com" rel="nofollow">support@rand.com</a></p>
<p>Please reference the following Autodesk article for installing prerequisites on <strong>Windows Server  </strong><a href="https://help.autodesk.com/view/RVT/2025/ENU/?guid=GUID-F0CFA1FA-166F-4693-AD2E-E1BA34A7F844" rel="nofollow"><strong>2016</strong></a> <strong>,  </strong><a href="https://help.autodesk.com/view/RVT/2025/ENU/?guid=GUID-7ECB1D45-7D04-4552-8EC2-7E5996D5DFFB" rel="nofollow"><strong>2019</strong></a> <strong> or</strong> <a href="https://help.autodesk.com/view/RVT/2025/ENU/?guid=GUID-BF12B6F3-F69B-4ABC-8F37-52A83945DB68" rel="nofollow"><strong>2022</strong></a> <strong>are supported. </strong></p>
<p><strong>Revit Server Installs</strong> (Optional)</p>
<ul>
<li>If you are going to be using <span style="color: #00ccff;"><strong>Revit Server</strong></span> with Clarity, please install all necessary versions of Revit Server prior to the Clarity install and verify that you can get to the Revit Server admin without error.  Do <strong><em>not</em></strong> create any projects yet.</li>
</ul>
<p><strong>Autodesk Revit</strong></p>
<p>If you are <strong><em>not</em></strong> using the host as a task server it is not necessary to install Revit.</p>
<h1><span style="text-decoration: underline; color: #3366ff;"><b>User Identity</b></span></h1>
<p>Because Clarity will likely need to access files on your network, you should decide in advance what <strong>UserId</strong> clarity should run under in order to give the appropriate permissions. </p>
<p>By default, Clarity will run as a low-privilege system account on the local machine – but that account will likely not have sufficient access to retrieve files from the network.</p>
<p>To manage this access appropriately, <strong>IMAGINiT</strong> <strong>recommends defining a domain account for your “Clarity User” – which will define the permissions for the Clarity application.</strong></p>
<p>Please reference the <a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/index.htm#rhsearch=security&amp;rhsyns=%20&amp;t=System_Setup%2FClarity_System_Identity_Setup.htm" rel="nofollow">Help</a> link or the <strong><u>Clarity Security Principle Setup</u></strong> document for the complete steps to configure Clarity to use this “Clarity User” for the following:</p>
<ul>
<li><span style="color: #3366ff;">CentralAdministrator Application Pools</span></li>
<li><span style="color: #3366ff;">Clarity Monitoring Windows Service</span></li>
<li><span style="color: #3366ff;">Microsoft SQL Server Database</span></li>
<li><span style="color: #3366ff;">Clarity ADSync</span></li></ul>]]></content:encoded>
    </item>
    <item>
      <title>Clarity 2024 Host System Requirements and Prerequisites</title>
      <description><![CDATA[<p>Introduction</p>
<p>These prerequisites are required for all types of Clarity host.</p>
<p>This guide does not cover the full configuration and operation of the software – merely the host system requirements and prerequisites.</p>
<p>Hardware/Operating System Requirements</p>
<p>Clarity requires a server-class Windows Server operating system to be the central web server. </p>
<p>A dedicated server is highly recommended.  Whether you will be using Revit Server in your environment or not, the prerequisites are the same for Clarity so the System requirements below should be referenced.</p>
<p>I highly recommend that you go with the Performance requirements, but no less than the Value for either[_cuted_]</p>]]></description>
      <pubDate>Thu, 13 Jul 2023 14:44:42 +0000</pubDate>
      <link>https://imaginit.helprace.com/i535-clarity-2024-host-system-requirements-and-prerequisites</link>
      <guid>https://imaginit.helprace.com/i535-clarity-2024-host-system-requirements-and-prerequisites</guid>
      <author>Sherry Pittman</author>
      <dc:creator>Sherry Pittman</dc:creator>
      <content:encoded><![CDATA[<h1>Introduction</h1>
<p>These prerequisites are required for all types of Clarity host.</p>
<p>This guide does <em>not</em> cover the full configuration and operation of the software – merely the host system requirements and prerequisites.</p>
<h1>Hardware/Operating System Requirements</h1>
<p>Clarity requires a server-class Windows Server operating system to be the central web server. </p>
<p>A dedicated server is highly recommended.  Whether you will be using Revit Server in your environment or not, the prerequisites are the same for Clarity so the <a href="https://www.autodesk.com/support/technical/article/caas/sfdcarticles/sfdcarticles/System-requirements-for-Revit-2024-products.html?us_oa=dotcom-us&amp;us_si=25fadbf5-a523-4ff7-92af-a63d2f823e8b&amp;us_st=Revit%202024%20system%20requirements" rel="nofollow">System requirements</a> below should be referenced.</p>
<p>I highly recommend that you go with the <strong>Performance</strong> requirements, but no less than the Value for either circumstance of concurrent users.</p>
<p>Projects must be stored on a physical drive meeting the requirements below.  NAS or SAN devices will not work and they are also <em>not supported</em> by Autodesk at this time.  Please refer to the following Knowledge base articles for additional information</p>
<ul>
<li><a href="https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Autodesk-support-for-Network-Attached-Storage-NAS-and-Storage-Area-Networks-SAN.html" rel="nofollow">https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Autodesk-support-for-Network-Attached-Storage-NAS-and-Storage-Area-Networks-SAN.html</a></li>
<li><a href="https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Support-for-non-Microsoft-networks.html" rel="nofollow">https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Support-for-non-Microsoft-networks.html</a></li>
</ul>
<p><strong>Hardware:</strong></p>
<p><img src="https://s3.amazonaws.com/chd-data/files/6620/976300907_5341e31ea75670163320c663e3cc3472_2234987/Host%20sys%20req.png" alt="" width="500" data-file="___chdfid_2234987___"></p>
<h1>Hard drive space: </h1>
<p>Roughly 12 GB of free space for the Clarity installation, with <strong><em>substantial</em></strong> additions dependent on the amount and size of projects and tasks being utilized.</p>
<p>There is still a good amount of information that needs space on the C drive, even if the projects and cache are assigned to a different drive. </p>
<h3 style="padding-left: 30px;"><u>Recommended Minimum</u></h3>
<p style="padding-left: 30px;"><strong><em>Minimum</em> 500 GB C drive</strong> allocation to avoid issues later related to not enough hard drive space on the C drive.  Additional drive for Data (Projects, Artifacts, etc) if also being stored on the C drive.</p>
<p style="padding-left: 30px;"><i><b>We do not recommend that you install the Clarity Task Server software on the host</b></i> since it is not a supported OS, but If you will also be using the host as a task server, additional drive space is required.</p>
<h3>RAM: </h3>
<p>This is a difficult question, because it is dependent on the number of users, projects, and size of projects being managed. This is particularly important if the server is going to be performing Revit operations, the size of the Revit RAM requirement often dwarfs the other requirements.</p>
<h3 style="padding-left: 30px;"><u>Recommended Minimum</u></h3>
<p style="padding-left: 30px;">Minimum <strong>16gb of ram on the host.</strong> </p>
<p style="padding-left: 30px;"><strong><u>Note:</u></strong>  If you plan on using the host as a task server, refer to the ram and hard drive space for <a href="https://www.autodesk.com/support/technical/article/caas/sfdcarticles/sfdcarticles/System-requirements-for-Autodesk-Revit-products.html?us_oa=dotcom-us&amp;us_si=2a8f0802-6dff-41fe-a4a7-3f6d0d607070&amp;us_st=Revit%202024%20system%20requirements" rel="nofollow">Revit</a>.</p>
<h1>Virtualization</h1>
<p>Most Clarity server deployments have taken place on Virtual Machines. Clarity supports VMware and Hyper-V based virtual machines. You must ensure that the virtual machine has sufficiently performing processor, memory, and disk resources for appropriate performance.</p>
<p><strong><u>Note:</u></strong></p>
<p>Anyone going with a Virtual setup should be asked how the IOPS performance of their setup would compare to the kind of physical drive Autodesk is looking for.</p>
<h1>Microsoft SQL Server</h1>
<p>Clarity 2024 provides Microsoft SQL Express 2017 as its database.  <strong>SQL Server Express limits</strong> the <strong>maximum</strong> database size to <strong>10GB</strong>.</p>
<p><strong><em>If you plan to have more than 100 active projects</em></strong><em>, you may wish to consider a full SQL Server license (or a separate SQL Server). Microsoft SQL Server version 2016 thru 2022 are supported.</em></p>
<p>We are often asked if it is permissible to use an <em>existing</em> full version of Microsoft SQL Server (on a corporate server). While this environment <em>should</em> work, it is not a fully tested configuration as of yet.</p>
<p>If this is an important issue, please raise it with your primary IMAGINiT contact.</p>
<h1>Software/OS Prerequisites</h1>
<p>Before deploying your Clarity Server, you must have the following prerequisite configuration set up for your Clarity Host.  The Revit Server prerequisites are required for all Clarity Host installations regardless of if you are going to be using Revit Server.</p>
<p>Please reference the following Autodesk article for installing prerequisites on <strong>Windows Server  </strong><a href="https://help.autodesk.com/view/RVT/2024/ENU/?guid=GUID-F0CFA1FA-166F-4693-AD2E-E1BA34A7F844" rel="nofollow"><strong>2016</strong></a> <strong>,  </strong><a href="https://help.autodesk.com/view/RVT/2024/ENU/?guid=GUID-7ECB1D45-7D04-4552-8EC2-7E5996D5DFFB" rel="nofollow"><strong>2019</strong></a> <strong> or 2022 are supported. </strong> At the time of this posting, there are no instructions for Windows Server 2022.</p>
<p><strong>Revit Server Installs</strong> (Optional)</p>
<ul>
<li>If you are going to be using Revit Server with Clarity please install all necessary versions of Revit Server prior to the Clarity install and verify that you can get to the Revit Server admin without error.  Do <strong><em>not</em></strong> create any projects yet.</li>
</ul>
<p><strong>Autodesk Revit</strong></p>
<ul>
<li>If you are <strong><em>not</em></strong> using the host as a task server it is not necessary to install Revit.</li>
</ul>
<h1>User Identity</h1>
<p>Because Clarity will likely need to access files on your network, you should decide in advance what <strong>UserId</strong> clarity should run under in order to give the appropriate permissions. </p>
<p>By default, Clarity will run as a low-privilege system account on the local machine – but that account will likely not have sufficient access to retrieve files from the network.</p>
<p>To manage this access appropriately, <strong>IMAGINiT</strong> <strong>recommends defining a domain account for your “Clarity User” – which will define the permissions for the Clarity application.</strong></p>
<p><strong>This account should have local admin rights.</strong></p>
<p>Please reference the <a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2024/index.htm#rhsearch=security&amp;rhsyns=%20&amp;t=System_Setup%2FClarity_System_Identity_Setup.htm" rel="nofollow">Help</a> link or the <strong><u>Clarity Security Principle Setup</u></strong> document for the complete steps to configure Clarity to use this “Clarity User” for the following:</p>
<ul>
<li>CentralAdministrator Application Pools</li>
<li>Clarity Monitoring Windows Service</li>
<li>Microsoft SQL Server Database</li>
<li>Clarity ADSync</li></ul>]]></content:encoded>
    </item>
    <item>
      <title>Clarity 2025 Task Server Requirements</title>
      <description><![CDATA[<p>We recommend that the task servers be at least comparable to workstations used in production, if not stronger, especially if you are planning on running multiple sessions of Revit and or multiple logins (not typically recommended due to permission issues). </p>
<p>When referring to the Revit System Requirements.</p>
<p>Do not go with anything lower than the Value, but Performance is recommended, or value with double the ram if you have large models with multiple links.</p>
<p>If you choose to use virtualization, be aware that graphic intense tasks will not perform as well without a physical graphics card.  Refer to the Virtualization section below.[_cuted_]</p>]]></description>
      <pubDate>Tue, 19 May 2026 13:56:48 +0000</pubDate>
      <link>https://imaginit.helprace.com/i678-clarity-2025-task-server-requirements</link>
      <guid>https://imaginit.helprace.com/i678-clarity-2025-task-server-requirements</guid>
      <author>Sherry Pittman</author>
      <dc:creator>Sherry Pittman</dc:creator>
      <content:encoded><![CDATA[<p>We recommend that the task servers be <strong><em>at least</em></strong> <span style="background-color: #ffff00;"><b>comparable to workstations used in production</b></span>, if not stronger, especially if you are planning on running multiple sessions of Revit and or multiple logins (not typically recommended due to permission issues). </p>
<p>When referring to the <b>Revit System Requirements.</b></p>
<p>Do not go with anything lower than the Value, but <span style="background-color: #ffff00;"><strong>Performance is recommended</strong></span>, or value with double the ram if you have large models with multiple links.</p>
<p>If you choose to use <span style="color: #3366ff;"><b>virtualization,</b></span> be aware that graphic intense tasks will not perform as well without a physical graphics card.  Refer to the <span style="color: #3366ff;"><b>Virtualization</b></span> section below.</p>
<h5><span style="text-decoration: underline; color: #3366ff; background-color: #ffff00;"><b>LICENSE COMPLIANCE</b></span></h5>
<h6>Task servers are essentially "filling in" for a physical user, so license compliance still applies to the task servers.  Please be aware that it is your responsibility to bring valid Autodesk licenses to each task server in order to stay in compliance.</h6>
<h2><span style="text-decoration: underline;"><span style="color: #3366ff; text-decoration: underline;"><b>System Requirements</b></span></span></h2>
<p>Please refer to the link below for specific information.</p>
<h6><a href="https://knowledge.autodesk.com/support/revit-products/troubleshooting/caas/sfdcarticles/sfdcarticles/System-requirements-for-Autodesk-Revit-2025-products.html" target="_blank" rel="nofollow">Revit System Requirements</a></h6>
<h2><span style="color: #3366ff;"><b>Supported Versions of Revit</b></span></h2>
<h5><span style="color: #3366ff;"><b>Revit 2021-2025</b></span></h5>
<p><i><b>If you still need to process Revit 2020 projects</b></i>, please leave a task server on Clarity 2024.1 to accommodate those tasks.</p>
<h2><span style="text-decoration: underline;"><span style="color: #3366ff; text-decoration: underline;"><b>Software Licensing</b></span></span></h2>
<p>Any task server being used to process tasks from Clarity will need the ability to run a licensed copy of Revit (network, borrowed or stand-alone), which will open up Revit models either as detached copies or live models depending on the project and settings for task processing. </p>
<p>Once installed, please launch all versions to make sure there are no licensing or other dialog boxes that need to be addressed.</p>
<h2><span style="text-decoration: underline; color: #3366ff;"><b>Hard Drive</b></span></h2>
<p><span style="color: #3366ff;"><b><strong>Minimum</strong> 500gb C drive</b></span>.  For 360 projects, the cache can quickly consume space on the hard drive and cause issues on the task server.</p>
<p><span style="background-color: #ffff00;">If you are running multiple sessions of Revit, increase this value accordingly.</span></p>
<h2><span style="text-decoration: underline; color: #3366ff;"><b>Ram</b></span></h2>
<p>Autodesk has historically recommended RAM in the amount of <em>20 times</em> the on-disk size of the file you have open plus the combined total of all of the Revit links.***</p>
<p><strong><u>How to Calculate Ram Requirements</u></strong></p>
<p><a href="https://knowledge.autodesk.com/support/revit-products/troubleshooting/caas/sfdcarticles/sfdcarticles/Revit-How-to-calculate-required-RAM-specific-to-a-project-size.html" rel="nofollow">https://knowledge.autodesk.com/support/revit-products/troubleshooting/caas/sfdcarticles/sfdcarticles/Revit-How-to-calculate-required-RAM-specific-to-a-project-size.html</a></p>
<p>***Models created in previous versions of Revit may require more available memory for the one-time upgrade process.</p>
<h2><span style="text-decoration: underline;"><span style="color: #3366ff; text-decoration: underline;"><b>Graphics Card</b></span></span></h2>
<p>It is recommended that you have a suitable graphics card as recommended in the <strong>Revit System requirements.</strong></p>
<h2><span style="text-decoration: underline;"><span style="color: #3366ff; text-decoration: underline;"><b>Virtualization</b></span></span></h2>
<p>Clarity supports VMware and Hyper-V based virtual machines. You must ensure that the virtual machine has a sufficiently performing processor, memory and disk resources for appropriate performance.</p>
<ul>
<li>Anyone going with a Virtual setup should be consider the IOPS performance of how their setup would compare to the kind of physical drive Autodesk is looking for.</li>
<li>As mentioned previously, graphic intense tasks such as pdf, dwg, dwf and navis <strong><em>will not perform as well</em></strong> as a machine with a recommended physical graphics card. This will impact the time it takes to process the task since it will be using softwaremode graphics.  This process time can be considerable compared to a physical machine depending on your setup.</li>
</ul>
<p>We did a Clarity Healthcheck with one firm using VMs with a graphics card, and we did a PDF benchmark with 164 sheets on a megaproject.
<br>
<br>
<span style="color: #3366ff;"><b>Physical server: 5 hours</b></span>
<br>
<span style="color: #3366ff;"><b>Virtual server: 16 hours</b></span>
<br>
<br>
(most of that difference – 10 hours - was in 4 particularly graphically intense sheets).
<br>
<br>
We also did the RFO Revit benchmarks on a VM task server and two production machines:
<br>
<br>
<img src="//imaginit.helprace.com/resources/asP6PXBsJp7OS9SznWfuW0SfY4jIyKpqui8iDdvC8Z24lwExv0H6emnB9qbes2fNeIU0yAhOzWFCmd3iwIHp4Q%7E%7E/Benchmark.png" alt="" width="500" data-file="___chdfid_2486406___">
<br>
<br>
This is not as drastic a difference, but it is 42% slower to print relatively basic sheets in the benchmark.</p>
<h3><span style="text-decoration: underline;"><b>Task Server Login Requirements for Revit</b></span></h3>
<p>The task server will need to be logged in at all times, in order for tasks to process.  The Task User is any user who is logged on to a task server.  Revit will run as that user, and the permissions will be that of the user.  The user logged into the machine must have permissions to read/write to all necessary folders.</p>
<h3><span style="text-decoration: underline;"><b>Task Server Requirements for Clarity Windows Task Server Service</b></span></h3>
<p>The service logon should be assigned to the designated Clarity account, typically a service account.</p>
<h3><span style="text-decoration: underline;"><b>Task Server Requirements for Clarity Forge Task Server</b></span></h3>
<p>This runs under the Clarity Windows task server service, but is a fee based service with Autodesk.</p>
<p>If the Forge Design Automation option is chosen, you must obtain and supply your own Autodesk Forge Developer Application Key to identify your application and link your Cloud Credit billing from Autodesk. </p>
<h3><span style="text-decoration: underline;"><b>Software Requirements</b></span></h3>
<ul>
<li><span style="text-decoration: underline;"><span style="color: #3366ff; text-decoration: underline;"><b>Revit</b></span></span>
<ul>
<li>All versions needed for projects with tasks being processed on this task server. (2021-2025)</li>
<li>Updates equal to the updates on users machines, preferably the most current</li>
<li>Since most 360 addins are installed as part of the update it is important to remain current.</li>
</ul>
</li>
</ul>
<p>Once installed, please launch all versions to make sure there are no licensing or other dialog boxes that need to be addressed.</p>
<ul>
<li><span style="text-decoration: underline;"><span style="color: #3366ff; text-decoration: underline;"><b>Autocad</b></span></span>
<ul>
<li>We will use the highest version installed so it is only necessary to install one version of the flavor of Autocad you wish to use.</li>
<li>Install all necessary object enablers</li>
<li>Refer to the following blog posts for additional requirements:  
<ul>
<li><a href="https://imaginit.helprace.com/i653-clarity-windows-task-server-settings" target="_blank">https://imaginit.helprace.com/i653-clarity-windows-task-server-settings</a></li>
<li><a href="https://imaginit.helprace.com/i493-clarity-windows-task-server-pre-requisites-for-autocad-nw-conversion" target="_blank">https://imaginit.helprace.com/i493-clarity-windows-task-server-pre-requisites-for-autocad-nw-conversion</a></li>
</ul>
</li>
</ul>
</li>
<li><span style="text-decoration: underline;"><span style="color: #3366ff; text-decoration: underline;"><b>Navisworks Manage or Simulate</b></span></span>
<ul>
<li>All versions needed for projects with tasks being processed on this task server.</li>
<li>Updates equal to the updates on users machines, preferably the most current</li>
</ul>
</li>
</ul>
<p><span style="text-decoration: underline;"><b style="font-size: 18px; font-family: Arial, Helvetica, sans-serif;">360 Requirements</b></span></p>
<p>In order for Clarity to access 360 cloud models, it is necessary for the Autodesk identity to have a valid license to access the live cloud model. </p>
<p>Due to Autodesk project selection limitation in the <b>16.x version of the Desktop Connector</b>, we have a mechanism to auto-select projects which requires a configuration setting in the Clarity task tray.  If you don't use the desktop connector to link or access files you do not need to install it.</p>
<p><a href="https://imaginit.helprace.com/i563-clarity-2024-task-server-config-to-auto-select-360-dc-projects" target="_blank">https://imaginit.helprace.com/i563-clarity-2024-task-server-config-to-auto-select-360-dc-projects</a></p>
<h5><span style="text-decoration: underline; color: #ff6600;"><b>The ADSSO and Desktop Connector</b></span></h5>
<ul>
<li><a href="https://knowledge.autodesk.com/support/bim-360/learn-explore/caas/CloudHelp/cloudhelp/ENU/About-BIM360/files/about-bim-360-design/About-BIM360-about-bim-360-design-bring-your-own-subscription-html-html.html" rel="nofollow">https://knowledge.autodesk.com/support/bim-360/learn-explore/caas/CloudHelp/cloudhelp/ENU/About-BIM360/files/about-bim-360-design/About-BIM360-about-bim-360-design-bring-your-own-subscription-html-html.html</a></li>
</ul>
<ul>
<li>Update the Autodesk Single Sign On (SSO)</li>
</ul>
<ul>
<li><b><a href="https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/simplecontent/content/autodesk-single-sign-component-update-for-2020-2021-product-versions.html" rel="nofollow">This article</a></b> will walk you through the installer steps to make sure the user's SSO is up to date.</li>
</ul>
<ul>
<li>Update the Autodesk Desktop Connector and sign in through that on the task servers</li>
<li>
<h6><span style="text-decoration: underline; background-color: #00ffff;"><b>Recommended version:</b></span> <b>Desktop Connector</b>: <span style="background-color: #00ffff;"><b>16.</b><strong>9.1 </strong></span></h6>
</li>
<li>
<h6><span style="background-color: #ffff00;"><strong>ONLY </strong></span><span style="background-color: #ffff00;"><strong>Clarity 25.1.6.0 or higher supports 16.12,</strong></span> <strong>ALL OTHER VERSIONS OF CLARITY USE <span style="background-color: #00ffff;">16.9.1</span> IF USING PROJECT SELECTION AUTOMATION</strong></h6>
<ul>
<li><strong>If you have a mixed environment of Clarity task servers and update the DC on older task servers, you will need to manually select projects on those task servers and uncheck the automation in the Task Tray</strong></li>
</ul>
</li>
</ul>
<h2><span style="text-decoration: underline; color: #3366ff;"><b>Available Tasks</b></span></h2>
<h6>For <span style="text-decoration: underline;"><b>Revit/Autocad/Navisworks tasks</b></span>, the designated 360 identity will need to be logged in via the Autodesk product or the desktop connector.</h6>
<h6>For <span style="text-decoration: underline;"><b>Clarity Windows task server tasks</b></span> will use the Oauth identity assigned to the project in Clarity.</h6>
<p>Below is a screen shot of available tasks, keep in mind that custom tasks may vary from what you see and some may require a different module for Clarity.</p>
<h3><img src="//imaginit.helprace.com/resources/i7PJ2G2mqPf8bNubY8NZ2U9AWfaX7pnq6DPW6iYBUHv4IH8i38tTiLDnje8Ehb_aRA1WcaNyceEMyFdHivcsoQ%7E%7E/Clarity+2025+tasks.jpg" alt="" width="750" data-file="___chdfid_2486393___"></h3>
<h2><span style="text-decoration: underline;"><span style="color: #3366ff; text-decoration: underline;"><b>Post Task Actions</b></span></span></h2>
<p>Historically, output files of the task would be sent from the task server to the host server, then the host server would deliver them to their final destination via the Post Task Action.</p>
<p>However, starting in Clarity 2023, Post Task Actions will run on the task server itself by default - so the files no longer need to be sent back to the host first. This will be done unless the option to "Perform Post Task Actions Locally" is un-checked in the task server options panel.</p>
<ul>
<li><a href="https://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/index.htm#t=Admin_%26_Coordinators_Guide%2FTask_Automation%2FPost_Task_Actions%2FAconex_Upload.htm&amp;rhsearch=aconex&amp;rhhlterm=aconex" target="_blank" rel="nofollow">Aconex Upload</a></li>
<li><a href="https://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Upload_to_BIM360.htm" target="_blank" rel="nofollow">BIM360 Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/BIMTrack_Upload.htm" rel="nofollow">BIMTrack Upload</a></li>
<li><a href="https://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025.1/index.htm#t=Admin_%26_Coordinators_Guide%2FTask_Automation%2FPost_Task_Actions%2FBluebeam_Upload.htm&amp;rhsearch=Bluebeam%20upload&amp;rhhlterm=bluebeam%20upload%20uploading" target="_blank" rel="nofollow">Bluebeam Upload (2025.1)</a></li>
<li><a href="https://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Upload_to_BOX.htm" target="_blank" rel="nofollow">Box Upload</a></li>
<li><a href="https://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Upload_to_DropBox.htm" target="_blank" rel="nofollow">Dropbox Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Google_Drive_Upload.htm" target="_blank" rel="nofollow">Google Drive</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Microsoft_OneDrive_Upload.htm" target="_blank" rel="nofollow">Microsoft OneDrive Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Microsoft_Sharepoint_Online_Upload.htm" target="_blank" rel="nofollow">Microsoft Sharepoint Online Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Microsoft_Teams_Upload.htm" target="_blank" rel="nofollow">Microsoft Teams Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Move_Copy_Files.htm" rel="nofollow">Move/Copy Files</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/FTP_Files.htm" target="_blank" rel="nofollow">Post to FTP</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Procore_Upload.htm" target="_blank" rel="nofollow">Procore Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/ProjectWise_Checkin.htm" target="_blank" rel="nofollow">ProjectWise Check in </a>(Requires Projectwise Module)</li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Run_Script.htm" target="_blank" rel="nofollow">Run Script File</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Sharepoint.htm" target="_blank" rel="nofollow">SharePoint Upload</a></li>
</ul>
<h3><span style="text-decoration: underline;"><b>Multiple Actions</b></span></h3>
<p>It is now possible to configure multiple post task actions for each task. Please note that some combinations of tasks in some orders may be not be compatible with each other.  For example, if the first action moves the files to another location, the second action will not know that the files have moved.</p>
<h2><span style="text-decoration: underline;"><span style="color: #3366ff; text-decoration: underline;"><b>Addins</b></span></span></h2>
<p>We recommend <span style="color: #3366ff;"><i><b>only installing addins needed for tasks</b></i></span>. </p>
<p>Some addins, include some from Autodesk, have been known to cause ownership issues when processing tasks.</p>
<p>You will need to install the necessary add ins per version as needed for the following type of tasks:</p>
<h4><span style="text-decoration: underline;"><b>Navisworks Exporter</b></span></h4>
<ul>
<li><a href="https://www.autodesk.com/products/navisworks/3d-viewers#navisworks-nwc-export-utility" rel="nofollow">https://www.autodesk.com/products/navisworks/3d-viewers#navisworks-nwc-export-utility</a></li>
</ul>
<h4><span style="text-decoration: underline;"><b>Navisworks Glue</b></span></h4>
<ul>
<li>Task requires Glue Configuration setup in Clarity
<ul>
<li>To obtain API keys for your company, contact your Autodesk Account Administrator or <a href="mailto:bim360glue.keyrequest@autodesk.com" rel="nofollow">keyrequest@autodesk.com</a></li>
</ul>
</li>
</ul>
<h4><span style="text-decoration: underline;"><b>Model Review</b></span></h4>
<p><strong><span style="background-color: #ffff00;">The ModelReview tool was discontinued as of the 2021 version</span>. Please refer to the BIM Interoperability Tools ModelChecker going forward.</strong></p>
<h4><span style="text-decoration: underline;"><b>IFC (Open Source IFC Exporter)</b></span></h4>
<ul>
<li><a href="https://apps.autodesk.com/" rel="nofollow">https://apps.autodesk.com/</a></li>
<li><a href="https://github.com/Autodesk/revit-ifc" target="_blank" rel="nofollow">https://github.com/Autodesk/revit-ifc</a></li>
</ul>
<h4><span style="text-decoration: underline;"><b>BIM Interoperability Tools</b></span></h4>
<p><span style="text-decoration: underline;"><b>https://imaginit.helprace.com/i736-bim-interoperability-tools-supported-versions</b></span></p>
<ul>
<li>Clarity supports a <span style="color: #3366ff;"><b>specific build of this tool</b></span>, so please check with <b>support</b> to see the supported versions for each version of Revit for the version of Clarity you have installed on the task servers</li>
<li><a href="http://manage.autodesk.com/" rel="nofollow">http://manage.autodesk.com</a></li>
</ul>
<h4><span style="text-decoration: underline;"><b>Publish to Autodesk Viewer</b></span></h4>
<ul>
<li>Requires additional setup also
<ul>
<li>You will first need to request a key from this site <a href="https://developer.autodesk.com/" rel="nofollow">https://developer.autodesk.com</a></li>
</ul>
</li>
</ul>
<h4><span style="text-decoration: underline;"><b>Collaboration for Revit</b></span></h4>
<ul>
<li>This is now included in the software and updates.</li>
</ul>
<h4><span style="text-decoration: underline;"><b>Dynamo</b></span></h4>
<p>Only one version of Dynamo should be installed on the task server.</p>
<h2><span style="text-decoration: underline;"><span style="color: #3366ff; text-decoration: underline;"><b>Tasks Requiring Extra Configuration</b></span></span></h2>
<h4><span style="text-decoration: underline;"><b>Revit Database Export Task</b></span></h4>
<p>If you are going to be running this task on a remote task server it will be necessary to do some additional configuration on the host.</p>
<p><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/index.htm#t=White_Papers%2FRemote_SQL_Database_Access.htm&amp;rhsearch=Revit%20DBExport&amp;rhsyns=%20" target="_blank" rel="nofollow">http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2025/index.htm#t=White_Papers%2FRemote_SQL_Database_Access.htm&amp;rhsearch=Revit%20DBExport&amp;rhsyns=%20</a></p>
<h4><span style="text-decoration: underline;"><b>Autocad PDF or Navis Conversion tasks</b></span></h4>
<p>This Windows task requires additional configuration, please refer to the following document:</p>
<p><a href="https://imaginit.helprace.com/i493-clarity-windows-task-server-pre-requisites-for-autocad-nw-conversion" target="_blank">https://imaginit.helprace.com/i493-clarity-windows-task-server-pre-requisites-for-autocad-nw-conversion</a></p>]]></content:encoded>
    </item>
    <item>
      <title>Clarity 2023 Task Server Requirements</title>
      <description><![CDATA[<p>We recommend that the task servers be at least comparable to workstations used in production, if not stronger, especially if you are planning on running multiple sessions of Revit and or multiple logins. </p>
<p>When referring to the Revit System Requirements I recommend that you go with the performance requirements.  If you choose to use virtualization be aware that graphic intense tasks will not perform as well without a physical graphics card.</p>
<p>System Requirements</p>
<p>Please refer to the link below for specific information.</p>
<p>Revit System Requirements</p>
<p>Operating Systems:  Windows 10 or 11</p>
<p>Supported Versions of Revit</p>
<p>Revit 2019-2023</p>
<p>Software Licensing</p>
<p>Any[_cuted_]</p>]]></description>
      <pubDate>Wed, 31 May 2023 12:56:07 +0000</pubDate>
      <link>https://imaginit.helprace.com/i492-clarity-2023-task-server-requirements</link>
      <guid>https://imaginit.helprace.com/i492-clarity-2023-task-server-requirements</guid>
      <author>Sherry Pittman</author>
      <dc:creator>Sherry Pittman</dc:creator>
      <content:encoded><![CDATA[<p>We recommend that the task servers be <strong><em>at least</em></strong> comparable to workstations used in production, if not stronger, especially if you are planning on running multiple sessions of Revit and or multiple logins. </p>
<p>When referring to the Revit System Requirements I recommend that you go with the <strong>performance requirements</strong>.  If you choose to use virtualization be aware that graphic intense tasks will not perform as well without a physical graphics card.</p>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>System Requirements</b></span></h3>
<p>Please refer to the link below for specific information.</p>
<p><a href="https://knowledge.autodesk.com/support/revit-products/troubleshooting/caas/sfdcarticles/sfdcarticles/System-requirements-for-Autodesk-Revit-2023-products.html" rel="nofollow">Revit System Requirements</a></p>
<p>Operating Systems:  Windows 10 or 11</p>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Supported Versions of Revit</b></span></h3>
<p>Revit 2019-2023</p>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Software Licensing</b></span></h3>
<p>Any task server being used to process tasks from Clarity will need the ability to run a licensed copy of Revit (network, borrowed or stand-alone), which will open up Revit models either as detached copies or live models depending on the project and settings for task processing. </p>
<p>Once installed, please launch all versions to make sure there are no licensing or other dialog boxes that need to be addressed.</p>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Hard Drive</b></span></h3>
<p><strong>Minimum</strong> 200gb C drive.  For 360 projects, the cache can quickly consume space on the hard drive and cause issues on the task server.</p>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Ram</b></span></h3>
<p>Autodesk has historically recommended RAM in the amount of <em>20 times</em> the on-disk size of the file you have open plus the combined total of all of the Revit links.***</p>
<p><strong><u>How to Calculate Ram Requirements</u></strong></p>
<p><a href="https://knowledge.autodesk.com/support/revit-products/troubleshooting/caas/sfdcarticles/sfdcarticles/Revit-How-to-calculate-required-RAM-specific-to-a-project-size.html" rel="nofollow">https://knowledge.autodesk.com/support/revit-products/troubleshooting/caas/sfdcarticles/sfdcarticles/Revit-How-to-calculate-required-RAM-specific-to-a-project-size.html</a></p>
<p>***Models created in previous versions of Revit may require more available memory for the one-time upgrade process.</p>
<h3><b><span style="text-decoration: underline;"><span style="color: #3366ff; text-decoration: underline;">Graphics Card</span></span></b></h3>
<p>It is recommended that you have a suitable graphics card as recommended in the <strong>Revit System requirements.</strong></p>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Virtualization</b></span></h3>
<p>Clarity supports VMware and Hyper-V based virtual machines. You must ensure that the virtual machine has a sufficiently performing processor, memory and disk resources for appropriate performance.</p>
<ul>
<li>Anyone going with a Virtual setup should be consider the IOPS performance of how their setup would compare to the kind of physical drive Autodesk is looking for.</li>
<li>As mentioned previously, graphic intense tasks such as pdf, dwg, dwf and navis <strong><em>will not perform as well</em></strong> as a machine with a recommended physical graphics card. This will impact the time it takes to process the task since it will be using softwaremode graphics.  This process time can be considerable compared to a physical machine depending on your setup.</li>
</ul>
<p>We did a Clarity Healthcheck with one firm using VMs with a graphics card, and we did a PDF benchmark with 164 sheets on a megaproject.
<br>
<br>
Physical server: 5 hours
<br>
Virtual server: 16 hours
<br>
<br>
(most of that difference – 10 hours - was in 4 particularly graphically intense sheets).
<br>
<br>
We also did the RFO Revit benchmarks on a VM task server and two production machines:
<br>
<br>
<img src="https://s3.amazonaws.com/chd-data/files/6620/2213915617_404f8df91fcb8a7e5e18a3cf9f831063_2110559/Benchmark.png" alt="" width="500" data-file="___chdfid_2110559___">
<br>
<br>
This is not as drastic a difference, but it is 42% slower to print relatively basic sheets in the benchmark.</p>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Task Server Login Requirements for Revit</b></span></h3>
<p>The task server will need to be logged in, in order for tasks to process.  The Task User is any user who is logged on to a task server.  Revit will run as that user, and the permissions will be that of the user.  The user logged into the machine must have permissions to read/write to all necessary folders.</p>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Task Server Requirements for Clarity Windows Task Server Service</b></span></h3>
<p>The service logon should be assigned to the designated Clarity account, typically a service account.</p>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Task Server Requirements for Clarity Forge Task Server</b></span></h3>
<p>This runs under the Clarity Windows task server service, but is a fee based service with Autodesk.</p>
<p>If the Forge Design Automation option is chosen, you must obtain and supply your own Autodesk Forge Developer Application Key to identify your application and link your Cloud Credit billing from Autodesk. </p>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Software Requirements</b></span></h3>
<ul>
<li>Revit
<ul>
<li>All versions needed for projects with tasks being processed on this task server.</li>
<li>Updates equal to the updates on users machines, preferably the most current</li>
<li>Since most 360 addins are installed as part of the update it is important to remain current.</li>
</ul>
</li>
</ul>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>360 Requirements</b></span></h3>
<p>In order for Clarity to access 360 cloud models, it is necessary for the Autodesk identity to have a valid license to access the live cloud model.  The ADSSO and Desktop Connector</p>
<ul>
<li><a href="https://knowledge.autodesk.com/support/bim-360/learn-explore/caas/CloudHelp/cloudhelp/ENU/About-BIM360/files/about-bim-360-design/About-BIM360-about-bim-360-design-bring-your-own-subscription-html-html.html" rel="nofollow">https://knowledge.autodesk.com/support/bim-360/learn-explore/caas/CloudHelp/cloudhelp/ENU/About-BIM360/files/about-bim-360-design/About-BIM360-about-bim-360-design-bring-your-own-subscription-html-html.html</a></li>
</ul>
<p>For Revit tasks, the designated 360 identity will need to be logged in via Revit or the desktop connector.</p>
<p>For Clarity Windows task server tasks will use the Oauth identity assigned to the project in Clarity.</p>
<ul>
<li>Update the Autodesk Single Sign On (SSO)</li>
</ul>
<ul>
<li><b><a href="https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/simplecontent/content/autodesk-single-sign-component-update-for-2020-2021-product-versions.html" rel="nofollow">This article</a></b> will walk you through the installer steps to make sure the user's SSO is up to date.</li>
</ul>
<ul>
<li>Update the Autodesk Desktop Connector and sign in through that on the task servers.</li>
<li>Recommended version: Desktop Connector: <b>15.</b><strong>8.0.1827</strong>
<ul>
<li><strong>16.x version not supported </strong></li>
</ul>
</li>
<li><a href="https://www.dropbox.com/s/jns4omuibvd38pe/Autodesk_Desktop_Connector_15_8_0_1827_Win_64bit.sfx.zip?dl=0" target="_blank" rel="nofollow"><strong>Download link</strong></a></li>
</ul>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Available Tasks</b></span></h3>
<p>Below is a screen shot of available tasks, keep in mind that custom tasks may vary from what you see and some may require a different module for Clarity.</p>
<h3><img src="https://s3.amazonaws.com/chd-data/files/6620/3503772642_7bd8c8f73efa85e4cb586d2aebfcd3e9_2110563/2023%20Tasks.png" alt="" width="600" data-file="___chdfid_2110563___"></h3>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Post Task Actions</b></span></h3>
<p>Historically, output files of the task would be sent from the task server to the host server, then the host server would deliver them to their final destination via the Post Task Action.</p>
<p>However, starting in Clarity 2023, Post Task Actions will run on the task server itself by default - so the files no longer need to be sent back to the host first. This will be done unless the option to "Perform Post Task Actions Locally" is un-checked in the task server options panel.</p>
<ul>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/BIMTrack_Upload.htm" rel="nofollow">BIMTrack Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Microsoft_OneDrive_Upload.htm" rel="nofollow">Microsoft OneDrive Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Microsoft_Sharepoint_Online_Upload.htm" rel="nofollow">Microsoft Sharepoint Online Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Microsoft_Teams_Upload.htm" rel="nofollow">Microsoft Teams Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/ProjectWise_Checkin.htm" rel="nofollow">ProjectWise Upload</a> (Requires Projectwise Module)</li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Google_Drive_Upload.htm" rel="nofollow">Google Drive</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Procore_Upload.htm" rel="nofollow">Procore Upload</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Move_Copy_Files.htm" rel="nofollow">Move/Copy Files</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/FTP_Files.htm" rel="nofollow">Upload to FTP</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Run_Script.htm" rel="nofollow">Run Script</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Upload_to_BIM360.htm" rel="nofollow">Upload to BIM360</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Upload_to_BOX.htm" rel="nofollow">Upload to BOX</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Upload_to_DropBox.htm" rel="nofollow">Upload to DropBox</a></li>
<li><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/Admin_&amp;_Coordinators_Guide/Task_Automation/Post_Task_Actions/Sharepoint.htm" rel="nofollow">Sharepoint Upload</a></li>
</ul>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Multiple Actions</b></span></h3>
<p>It is now possible to configure multiple post task actions for each task. Please note that some combinations of tasks in some orders may be not be compatible with each other.  For example, if the first action moves the files to another location, the second action will not know that the files have moved.</p>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Addins</b></span></h3>
<p>We recommend only installing addins needed for tasks.  Some addins, include some from Autodesk, have been known to cause ownership issues when processing tasks.</p>
<p>There is additional configuration for the Navis Glue and Autodesk Viewer tasks. </p>
<p>Additionally, you will need to install the necessary add ins per version as needed for the following type of tasks:</p>
<h4>Navisworks Exporter</h4>
<ul>
<li><a href="https://www.autodesk.com/products/navisworks/3d-viewers#navisworks-nwc-export-utility" rel="nofollow">https://www.autodesk.com/products/navisworks/3d-viewers#navisworks-nwc-export-utility</a></li>
</ul>
<h4>Navisworks Glue</h4>
<ul>
<li>Task requires Glue Configuration setup in Clarity
<ul>
<li>To obtain API keys for your company, contact your Autodesk Account Administrator or <a href="mailto:bim360glue.keyrequest@autodesk.com" rel="nofollow">keyrequest@autodesk.com</a></li>
</ul>
</li>
</ul>
<h4>Model Review</h4>
<ul>
<li><a href="https://manage.autodesk.com" rel="nofollow">https://manage.autodesk.com</a></li>
</ul>
<h4>IFC (Open Source IFC Exporter)</h4>
<ul>
<li><a href="https://apps.autodesk.com/" rel="nofollow">https://apps.autodesk.com/</a></li>
</ul>
<h4>BIM Interoperability Tools</h4>
<ul>
<li><a href="http://manage.autodesk.com" rel="nofollow">http://manage.autodesk.com</a></li>
</ul>
<h4>Publish to Autodesk Viewer</h4>
<ul>
<li>Requires additional setup also
<ul>
<li>You will first need to request a key from this site <a href="https://developer.autodesk.com" rel="nofollow">https://developer.autodesk.com</a></li>
</ul>
</li>
</ul>
<h4>Collaboration for Revit</h4>
<ul>
<li>This is now included in the software and updates.</li>
</ul>
<h4>Dynamo</h4>
<p>Only one version of Dynamo should be installed on the task server.</p>
<h3><span style="text-decoration: underline; color: #3366ff;"><b>Tasks Requiring Extra Configuration</b></span></h3>
<h4>Revit Database Export Task</h4>
<p>If you are going to be running this task on a remote task server it will be necessary to do some additional configuration on the host.</p>
<p><a href="http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/index.htm#t=White_Papers%2FRemote_SQL_Database_Access.htm&amp;rhsearch=Revit%20DBExport&amp;rhsyns=%20" rel="nofollow">http://s3.amazonaws.com/IMAGINiTSoftware/Documentation/Clarity/2023/index.htm#t=White_Papers%2FRemote_SQL_Database_Access.htm&amp;rhsearch=Revit%20DBExport&amp;rhsyns=%20</a></p>
<h4>Autocad PDF or Navis Conversion tasks</h4>
<p>This Windows task requires additional configuration, please refer to the following document:</p>
<p><a href="https://imaginit.helprace.com/i493-clarity-windows-task-server-pre-requisites-for-autocad-nw-conversion" target="_blank">https://imaginit.helprace.com/i493-clarity-windows-task-server-pre-requisites-for-autocad-nw-conversion</a></p>]]></content:encoded>
    </item>